Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T10CM03220
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/16/2010 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 11/16/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide the size of the grease duct. 2. Show how the existing make up air system is to be modified. 3. Provide an air balance for the hood and make-up air system. |
| 11/16/2010 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
| 11/16/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/16/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PROVIDE DETAIL OF HOW HOOD IS SUPPORTED FROM EXISTING STRUCTURE ABOVE. INCLUDE NEW FRAMING MEMBER SIZES AND CONNECTIONS. |
| 11/16/2010 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 11/16/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the background on sheet P1 to be legible. 2. Provide an upper terminal cleanout for the new floor sink. 3. Provide a direct connection for the wash and rinse sections of the new bar sink. 4. Provide a trap (w/o a vent) for the ice bin drain (over five feet). |
| 11/16/2010 | MARTIN BROWN | FIRE | REVIEW | Denied | Please provide code review data, specifically occupancy, occupant load, and whether or not the building contains fire sprinklers. |
| 11/16/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
| 11/16/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 12/01/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 12/01/2010 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |