Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T10CM03108
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2011 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need to have Structural Engineers seal and signature on both sets of pre-fabricated metal building specifications. 2. Please provide two sets of pre-fabricated metal building concrete foundation calculations with architects seal and signature. 3. Please provide two copies of the geo-technical soils investigation referenced to on sheet S-1. All structural designs are to follow those reccommendations. 4. The West exit side door is non compliant as per IBC section 1107.2. 5. As per 2006 IBC, Table 602, the West wall must be 1 hour rated. 6. Please provide a north arrow on all floor plans. END OF REVIEW |
01/04/2011 | MARTIN BROWN | FIRE | REVIEW | Approved | |
01/04/2011 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
01/04/2011 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/04/2011 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not resolved; the additional note on details 2/P2 and 4/P2 are inadequate and no information is shown on the structural drawings. Structural design of the mounting shelf must be shown on the drawings. Reference: Section 103.2.3, UPC 2006. [Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.] 2. Comment not resolved; specify the "hot water mixing valve" noted in detail 2/P2. Not all mixing valves are listed for tempering the water temperature for fixtures. Reference: Section 310.4, UPC 2006. [Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.] 3. Revise the water heater details, 2/P2 and 4/P2, to eliminate the valve located between the vacuum relief and the storage tank. Reference: Section 310.4, UPC 2006. [Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief, and valves. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006.] 4. Comment not resolved; indicate on the drawing how the shut off valve is to be made "accessible at all times". [Provide a CW shut off valve for the building water service entrance.] Reference: Section 605.2, UPC 2006. 5. Comment not addressed; contact Tucson Water Mapping at (520) 837-2167 for the water pressure range at the project address. [Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006.] 6. Comment not addressed. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). In addition, the cleanouts shall be sized per Section 707.11 which means that the 3" FCO shown on the sanitary and vent diagram cannot be used for the 4" building drain. Reference: Section 707.4, UPC 2006. [Provide cleanouts for the upper terminals of the building drain and its horizontal branches. Reference: Section 707.4, UPC 2006.] 7. Comment not resolved; drain pipes 3" and smaller must have a minimum slope of ΒΌ" per foot. [Revise the slope of the horizontal drainage piping to comply with the requirements of Section 708.0, UPC 2006.] 8. Comment not resolved; provide the size and slope of the gutters. [Provide roof drain calculations and sizing information for the gutters and downspouts. Reference: Section 1106.0, UPC 2006.] Note: Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration, states that a notation shall be placed beneath the seal, either written, typed, or electronically generated, that provides the day, month, and year of the expiration of current registration. (Effective March 8, 2008). |
01/04/2011 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
01/06/2011 | GERRY KOZIOL | WWM | REVIEW | Approved | |
01/07/2011 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/10/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: 945 E. 22nd Street T10CM03108 Building Plan (2nd Review) TRANSMITTAL DATE: January 10, 2011 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The building plan appears to match the development package. Zoning will approve the building plan once Building and Plumbing have approved the building plan. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved development package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10cm03108.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/10/2011 | CPIERCE1 | OUT TO CUSTOMER | Completed |
01/10/2011 | SUE REEVES | REJECT SHELF | Completed |