Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T10CM03108
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/08/2010 | MARTIN BROWN | FIRE | REVIEW | Denied | On Pg A1-D rear exit door call out detail shows 102, on Pg A4-D shows door type "C". On Pg A5-D there is no "C". |
11/10/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Sheet Numbers S1D, S2D, S3D, S-1 and S-2 are not code compliant. All permit drawings must be 100% complete construction documents for construction. 2. Please provide an approved site plan. 3. Please coordinate door types on schedule to actual door types illustrated. Door type "C" is missing. 4. The minimum allowed height for lettering is 3/32". Drawing Numbers S2, A3.1-D and M-1 are non compliant. 5. Provide structural calculations for the following: a. Structural concrete foundation b. Light Standard concrete foundation c. Water heater bracket 6. Provide a list of deferred and send to the Building official, Mr. Ron Boose for addition fee assessment. Include the metal building as a deferred submittal. 7. Provide Special Inspections Certifications as per the 2006 IBC, Sections 106 and 1704.1. END OF REVIEW |
11/10/2010 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building plan will be stamped approved after the final approval of the Development Plan package. |
11/10/2010 | RONALD BROWN | ZONING HC | REVIEW | Passed | Reference Building Comments |
11/17/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. 2. Provide a site drawing which includes the following information: a. the location and size of the water meter b. the location of the main water lines and fire hydrants c. the location of the gas meter (if one is planned) d. the location and size of the public sanitary sewer e. the location of the building connection to the public sewer f. the location, invert, and rim elevation of the upstream and downstream manholes and cleanouts g. the first floor elevation for the building Reference: City of Tucson Development Standard No. 2-05.0, Section 2.3 D and Section 103.2.3, UPC 2006. 3. Indicate the materials to be used in the proposed plumbing systems for this activity. Reference: Sections 103.2.3, 301.1, 604.0, 701.0, 903.0, 1102.0, and 129.5, UPC 2006. 4. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference: Section 103.2.3, UPC 2006. 5. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 6. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 7. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief, and valves. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006. 8. Provide a CW shut off valve for the building water service entrance. Reference: Section 605.2, UPC 2006. 9. Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006. 10. Provide cleanouts for the upper terminals of the building drain and its horizontal branches. Reference: Section 707.4, UPC 2006. 11. Revise the slope of the horizontal drainage piping to comply with the requirements of Section 708.0, UPC 2006. 12. Provide cleanouts in the building sewer at intervals not exceeding 100 feet. Reference: Section 719.1, UPC 2006. 13. Provide roof drain calculations and sizing information for the gutters and downspouts. Reference: Section 1106.0, UPC 2006. |
11/17/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006. 2. Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water (i.e. usually not inside of the building). Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
11/18/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 3/32-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Provide energy code compliance calculations (using the climate zone for Pima County < 4,000 feet). Provide sufficient detail on the drawings to evaluate the energy compliance of the building envelope. The information shall, as a minimum, include U-factors of the envelope systems and fenestration components, along with the R-values of the insulation and the SHGC for the fenestration. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006. 3. Specify the minimum resistance (R-value) of the duct insulation to be used on ducts inside of the building. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 4. Clarify the heat source for the proposed HVAC units; electric resistance heating per the schedule or gas heat per the detail. Reference: Section 106.3.1, IMC 2006. 5. Clarify the termination points for the HVAC unit condensate drains. Condensate drains may not terminate in an area that is not capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. 6. If the freezer units have condensate drains, show their location, size and termination points. Reference: Section 307.2.1, IMC 2006, as amended by the City of Tucson. 7. Provide calculations demonstrating adequate ventilation. Reference: Section 401.2, IMC 2006. 8. Revise the sequence of operation for the restroom exhaust fans so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006. |
11/22/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Dollar Store - 945 E 22nd Street T10CM03108 Building Plan (1st Review) TRANSMITTAL DATE: November 22, 2010 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning can not approve the building plan until the Development Package has been approved. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved Development Package. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10cm03108.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
11/23/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | need review/approval for canopy for capacity evaluation and/or point and method of connection by PCRWRD DEV LIAISON UNIT- 3RD FL PWB- 740-6534 PROVIDE APPROVED DP 10-0030 FROM COT |
11/24/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T10CM03108 945 E 22nd ST New Dollar Store The electrical plans have been denied for the following: 1. E-1, provide a location for the service on the outside of the building. 2. Provide the type and size of conductors and conduits to be used from the service to the utility, in this jurisdiction, this is required because the contractor installs. 3. Provide a fault current calculation beginning at the service on through to the panels and list in each panel. 4.The feeder from service gutter to panel A to have a #3 cu equipment grd per 2005 NEC 250.122, since the over-current device ahead of it is 400 amps. 5. The same as #4 above applies to panels B and C, the equipment grounds to be #3 cu. 6. Provide outdoor lighting calculations per the City of Tucson ORD # 10135 -Outdoor Lighting Code. This ord can be found on the City of Tucson Web Site. 7. Provide Indoor Lighting Budget Calculations per 2006 IECC requirements. Com Check ok 8. Provide fixture cut sheets. Ray T Majuta, Elect Pln Ck, PDSD, City of Tucson, 11/28/10, Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/07/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
12/07/2010 | SUE REEVES | REJECT SHELF | Completed |