Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T10CM03034
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/29/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T10CM03034 9135 E. Calle Kuehn Design Development Option (DDO) (1st Review) TRANSMITTAL DATE: October 29, 2010 Site Plan OK DDO required for the following. 1. Per LUC Section 3.2.6.4, R-1 Zone, Development Designator "G", Perimeter Yard Indicator "AA" the required perimeter yard setback is 6.0' or 2/3 the height of the exterior wall. Based on an exterior wall height of 8.58' the required perimeter yard setback from the proposed shed and porch to the west property line is 6.0', proposed setback is 4.5'. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10CM03034.doc |
| 12/03/2010 | CPIERCE1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | WATER | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | WWM | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | ENGINEERING | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | FIRE | REVIEW | Needs Review | |
| 12/03/2010 | CPIERCE1 | ADA | REVIEW | Needs Review | |
| 12/03/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 12/03/2010 | CPIERCE1 | ZONING HC | REVIEW | Needs Review |