Permit Number: T10CM02941
Parcel: 13355231B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM02941
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/22/2010 MARTIN BROWN FIRE REVIEW Approved
10/29/2010 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A011: THE DESIGN PROFESSIONAL DID NOT SEAL, SIGN AND DATE THE DRAWING.
2. GENERAL: THE DESIGN PROFESSIONAL SHOULD INCLUDE THE LICENSE EXPIRATION DATE ON EACH SHEET, LOCATED NEAR THE SIGNED, DATED SEAL.
11/01/2010 ERIC NEWCOMB ZONING HC REVIEW Approved
11/05/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied The new dehumidifying unit (DHU-8) does not introduce any outdoor air into the building. Show that adequate ventilation is still being supplied to the building. Reference: Sections 102.4 and 401.2, IMC 2006 and Section 403.3, IMC 2003.
11/05/2010 ROBERT SHERRY WATER REVIEW Approved
11/10/2010 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. Provide information to show that the hub drain (detail 3/P351) complies with Sections 411.1 and 804.1, UPC 2006.
2. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006.
3. Provide cleanouts sized per Section 707.11, UPC 2006.
4. Revise the slope of the horizontal drainage piping to comply with the requirements of Section 708.0, UPC 2006.
11/12/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project:T10CM02941
9615 E Old Spanish Tr
Target T-1863,TI

The electrical plans have been denied for the following:

1.Provide a fault current calculation for let through to panels LP-12A, LP-12B and LP-13, the panel schedules show a 10,000 RMS, with the panels feeding from MDS.
2. Panel LP-12A and LP-12B, state on schedules that they
are fed from T-2, should be T-12.
3. Note on plans that panels LP-12A and B are feed thur listed.
4. Is the distance from Transformer T-12 to the panels covered under the tap rules of NEC 2005-240. What will the distance be on their feeders?
5. Sheet E211 shows circuits 4,6,8,10,12,14,16,18, from Panel LP5B, this panel is not in the panel schedule sheet?
6.Panel LP-12A is shown as only a 100 amp bus on schedule.
7. Panel LP-12A is a MLO while LP-12B has a main ?

Ray Majuta,PDSD,City of Tucson,
Elect Pln CK,
11/13/10,
Ray.Majuta@tucsonaz.gov
11/17/2010 GERRY KOZIOL WWM REVIEW Denied NEED TO PROVIDE COMPLETE PLUMBING FIXTURE SCHEDULE TO INCLUDE THE TOTAL # OF ALL FIXTURES PROPOSED & DEMOED (THIS INCLUDES FLOOR SINKS & DRAINS) WITH SPECIFIC WASTE PIPE SIZE.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/23/2010 GERARDO BONILLA OUT TO CUSTOMER Completed
11/23/2010 SUE REEVES REJECT SHELF Completed