Permit Number: T10CM02721
Parcel: 13332013J

Review Status: Completed

Review Details: SITE

Permit Number - T10CM02721
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/01/2010 DAVE MANN FIRE REVIEW Approved
11/01/2010 RBROWN1 ADA REVIEW Passed
11/01/2010 LOREN MAKUS ENGINEERING REVIEW Denied November 5, 2010
Dunkin Donuts
T10CM02721
T10BU01645

1. Provide curb returns with 25-foot radii for the entrance from Harrison Road in accordance with the Transportation Access Management Guidelines.
2. Show the existing and future sight visibility triangles for the intersection of Broadway and Harrison.
3. Show how the water harvesting areas will accumulate water. The grades along the water harvesting area drop by at least two feet. Show how smaller areas will be created to maximize ponding. Remove the "MAX" from the water harvesting area notes. Deeper depressions may be required at some locations within the water harvesting areas to allow for 6 inches of ponding.
4. Show with flow arrows, grades and curb openings how water will be directed to the landscape areas for water harvesting.
5. In the hydrology report and the site plan show how the site will discharge to adjacent properties and right of way.
11/05/2010 RONALD BROWN ZONING HC REVIEW Denied 1. At the East side of the marked crossing to the accessible parking aisle, change the angle of the marked crossing to provide a detectable warning strip to be as wide as the marked crossing, ICC (ANSI 117.1), Section 406.12.
2. Please transfer any information shown on detail 5/4 that is not on detail 7/4 and delete detail 5/4.
3. DETAIL 7/4
a. The North end of the marked crossing to Broadway, please show the slope of flared sides of the curb to be 1:10 as per ICC (ANSI 117.1), Section 406.3.
b. The East end of the accessible parking aisle requires a curb ramp to access the accessible route connection to the Easterly located commercial property.
4. There is only one accessible parking spce shown and your building data calcuklations call for 2.
END OF REVIEW
11/12/2010 ANDREW CONNOR LANDSCAPE REVIEW Denied 1. Within a vehicular use area, one (1) canopy tree is required for each four (4) motor vehicle parking spaces LUC 3.7.2.3 Additional trees are required.

2. Show existing and future sight visibility triangles on the site, grading and landscape plans DS 2-02.2.1.A.10.

3. Note: All landscaping and screening must comply with the sight visibility requirements of Development Standard 3-01.0. Plant materials located within sight visibility triangles should consist of ground cover or low-growing vegetation of a species that will not grow higher than thirty (30) inches.

4. Indicate existing vegetation to remain in place within adjacent rights-of-way.

5. Ensure that all planters within vehicle use area have curb cuts for water harvesting. Revise the site, landscape and grading plans as necessary.

6. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape plan.

7. Ensure that all Engineering comments and concerns are addressed
11/16/2010 ANDREW CONNOR NPPO REVIEW Approved
11/16/2010 TERRY STEVENS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Terry Stevens
Lead Planner

PROJECT: T10CM02721
9485 E. Broadway Blvd.
Site Plan

TRANSMITTAL DATE: 11/17/10

COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. DS 2-02.2.1.A.5 Provide the bearing of the south property line.

2. DS 2-02.2.1.A.10 The indicated future sight visibility triangles along Broadway do not appear to be correct. Clearly indicate the location of the future curb and sidewalk along both Broadway and Harrison as indicated it is not correct.

3. DS 2-02.2.1.A.11 A cross access agreement has been provided. Indicate by note the docket and page recording information for the cross access agreement.

4. DS 2-02.2.1.A.12 The sidewalk connecting to Harrison Rd at the access aisle for the handicap parking space appears to be blocked by a curb. Clearly indicate if the sidewalk is flush with the access aisle or if raised indicate a handicap ramp.

Provide pedestrian circulation path to the trash enclosure per DS 2-08.3.1. The pedestrian circulation path must be physically separated from all vehicular use areas except when crossing the PAAL.

5. DS 2-02.2.1.A.14 Clearly indicate the maneuvering area for the loading zone. Contact engineering for clarification.

The loading zone indicated appears to be located over the speaker stand. Revise.

The loading zone appears to be located over the clearance bar for the drive thru. Unless the clearance bar is set at 15' clearance (required for a loading zone) it may have to be relocated. Clarify.

If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

C:\planning\cdrc\DSD\T10CM02721.doc
11/16/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
12/01/2010 SUE REEVES OUT TO CUSTOMER Completed
12/01/2010 SUE REEVES REJECT SHELF Completed