Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T10CM02703
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/25/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
| 10/26/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The Code Review Checklist on sheet T1.0 calls out the 2006 IPC The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. 2. Provide the reference material for the Pima County Waste Water discharge permit #12875. The note on sheet P2.1 also calls for a discharge pit to be installed per Pima County requirements; provide the installation drawings. If the discharge pit was installed previously, provide copies of the approved inspection reports by Pima County. 3. The minimum residual water pressure is 15 PSI or as required for the specified plumbing fixture or appliance. For example, an American Standard water closet requires a minimum pressure of 20 PSI for proper operation as does the Oasis water fountain. Reference: Section 608.1, UPC 2006. (Note that the specified water closet is a discontinued product.) |
| 10/26/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/26/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed; detail 1/M2.1 shows how the threaded rods are connected to the fan coil but does not show how the threaded rods are connected to the building structure. Show how the fan coils are being connected to the building structure and provide calculations to show that the building structure is not being adversely affected. Reference: Section 302.1, IMC 2006. 2. Comment not resolved; show where the secondary drains are to be terminated. Clarify the termination points of the secondary condensate drains from the fan coils. Reference: Section 307.2.3, IMC 2006. 3. Comment not resolved; the heat pump schedule does not indicate the heating capacity of the heat pumps and no appeal to the building official has been approved. Provide sufficient heat for the manufacturing and office areas to maintain a minimum temperature of 68 F on a design heating day (32 F). Reference: Section 309.1, IMC 2006. 4. Revise the ductwork for corridor 31 so that it is not being used as a return duct for rooms 27 and 28. Reference: Section 601.2, IMC 2006. |
| 11/02/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT 18: SHEET S2.2; SECOND FLOOR FRAMING PLAN: THE DETAIL REFERENCE ON GRID 1 WAS CHANGED FROM 202 TO 207, WHICH IS STILL AN INCORRECT REFERENCE (SHOULD BE 201). REVISE. |
| 11/04/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
| 11/04/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/04/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | needs WWcredit evaluation - 5th floor needs IWC review/approval Tom Tonchak, 443-6200- 5025 W Ina RD need capacity evaluation by Kurt stemm 740-6534- 3rd floor |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/04/2010 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 11/04/2010 | SUE REEVES | REJECT SHELF | Completed |