Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM02694
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/28/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Snap Fitness T10CM02694 Building Plan (1st Review) TRANSMITTAL DATE: September 28, 2010 1. Provide a complete vehicle parking space calculation for the entire site on the cover sheet. 2. Reference the Development Plan number D04-0019 on the cover sheet. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10cm02694.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
09/28/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top unit. Reference: Section 302.1, IMC 2006 |
09/28/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/28/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
09/28/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1: WITH THE NEW SQUARE FOOTAGE AND THE NEW OCCUPANT LOAD (4588 SF AND 92 OCCUPANTS), TWO RESTROOMS ARE REQUIRED FOR BOTH MEN AND WOMEN (SEE IBC TABLE 2902.1). 46 MALE AND 46 FEMALE OCCUPANTS REQUIRE TWO RESTROOMS EACH (ONE PER 25 FOR THE FIRST 50). REVISE. |
09/28/2010 | RSHERRY1 | WWM | REVIEW | Passed | No new plumbing fixtures. |
09/28/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
09/28/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
09/28/2010 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
09/28/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
09/28/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
09/30/2010 | CPIERCE1 | ENGINEERING | REVIEW | Needs Review |