Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T10CM02531
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/13/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
09/14/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
09/17/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | Tucson Water limits a 1-1/2" meter to a maximum demand of 50 GPM. Provide a letter from Tucson Water confirming that the use of a 1-1/2" water meter will be allowed for this project. Reference: Sections 610.2 and 610.12, UPC 2006. |
09/20/2010 | RONALD BROWN | HC | REVIEW | Denied | |
09/20/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | SHEET A11.7 1. For the "Type "A" Elevation" please show exact product sizes, mounting heights and locations for back bar to be mounted between the lav back splash and the bottom of the mirror. I don't think this is going to work and be compliant. STRUCTURAL REVIEW 2. Please provide Special Inspection Certifications for review and approval. 3. Please provide complete structural calculations for all concrete foundations and footings. a. As per the note on page 2-1 of the structural calculations, no geotechnical evaluation and report was provided for foundation design. Please design all foundations as per recommendations of the Geotechnical Investigation Report prepared by Foree&Vann, Inc., dated 5 March 2010 that was submitted with the permit documents. 4. Structural calculation evaluations shown for the SIPS is not sufficient. Please provide a complete manufacturer's product literature along with structural calculations for all conditions. a. If the SIPS is to be a deferred submittal, please provide another letter to the building official for additional fee assessment. 5. Please provide complete structural calculations for the suspended heat pump. 6. At the balcony East and West ends show a guard rail. 7. Show a North arrow on all floor plans and partial plans. 8. The building summary on sheet AS-1 schedules this building as having 2 existing rehabbed units and 13 new units. This is not reflected on sheets A-11 and A11.1. 9. Please recalculate the square footages of all new buildings providing summaries for the following: Living areas, covered patios/balconies, stairs and elevators. 10. The foundation and roof framing plans make no distinction between new and existing buildings. 11. Please show north arrow on all floor plans and any partial floor plans. END OF REVIEW |
09/21/2010 | DAVID RIVERA | ZONING | REVIEW | Denied | FROM: David Rivera Principal Planner PROJECT: T10CM02526 875 W. Miracle Mile Ghost Ranch - Thirteen Unit Building Two Story - building 12 TRANSMITTAL DATE: September 20, 2010 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. Review the square footage of building 8 based on the actual building dimensions labeled on sheet A-6.0. Ensure that the correct square footage has been listed on sheet AS-1. Please ensure that when calculating the square footages of the building that the outside dimensions are used and all non enclosed areas such as porches are not included. Carports are not part of the dwelling square footage but do count towards the lot coverage and should be listed as carport square footage where applicable. While the additional square footage does not increase the need for additional parking spaces it does affect the lot coverage and floor area ratios. The development criteria will have to be revised as required to match the actual per the floor plan dimensions. I acknowledge the note for the replacement of existing windows but I'm not sure that this is what Jonathan had in mind. I believe but I admit I'm not clear myself if the note is intended for existing windows or was it to include the new ones. I have put in a call to Jonathan for some feed back but I am requesting that you (Paul) do the same and get a clarification. The note will have to be revised to include all new windows to match the old design. In this case I don't think the design of the windows match casement windows. 2. After reviewing and comparing the building package site plan and landscape plan with the previously approved site and landscape plans it is clear that there are some changes to the site and building one that must be addressed. Zoning is requesting that a revised site and landscape plan is submitted for review and approval for the proposed changes which include the square footage of building one and the redlined areas on sheet AS-1. 3. When submitting the revised site and landscape plans for review, include a cover letter explaining the changes that have been made. These are the changes noted as part of this zoning review, which will include any calculation changes. a. Cross walk location and access ramps at main entrance along Miracle Mile. b. Sidewalk and the access ramp at the corner of Fairview and Miracle Mile. c. Sidewalks, access ramps and crosswalk at the northwest entrance along Fairview. d. Crosswalks and access ramps between buildings 1 and 3. e. Relocation and addition of an additional HC parking adjacent to buildings 1 and 2. f. Sidewalks and relocation of the bicycle parking facilities from building 3 to building 4. g. Calculations for building square footage must be revised. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. C:\planning\idrive\cdrc\DSC\Ghostranch lodge units 1-12.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
09/24/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. 2. The minimum residual water pressure is 15 PSI unless it can be shown that no specified fixtures or appliances require minimum residual pressures greater than 8 PSI. Note that some water closets and some appliances (e.g. dishwashers and clothes washers) require minimum residual pressures greater than 15 PSI. Reference: Section 608.1, UPC 2006. 3. Specify the precise method to be used to sterilize the PEX water distribution system that meets the requirements of the PEX manufacturer. The UPC provides two methods of sterilization and one of them (200 ppm for 3 hours) may be harmful to the PEX. Reference: Sections 310.4 and 609.9, UPC 2006. 4. The pipe sizing chart, shown on sheet P-15, is supposed to be based on a friction factor of 6.8 PSI per 100 feet of pipe. If it is designed for sizing the aboveground piping (PEX), the stated upper limits for each tubing size are incorrect. All of the friction factors are in excess of 10.6 PSI per 100 feet and the tubing sizes of 1" and greater have velocities much greater than 8 FPS. Revise the chart as required to limit the pressure drops to the calculated values and the velocities to 8 feet per second or less. 5. The maximum developed length for a 1-1/4" trap arm is 2'-6". Reference: Section 1002.2, UPC 2006. 6. Clarify how an air gap fitting will be employed for terminating the HVAC condensate drain. Reference: Sections 103.2.3 and 807.2, UPC 2006. |
09/27/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The 2006 International Mechanical Code with Local Amendments is the relevant code for this project, not the International Residential Code. Note also that a "concealed attic system" (R806.4, IRC 2006) is not a part of the IBC and will require an appeal to the building official based on Section 104.11, IBC 2006. 2. Provide the required documentation described in Section 404.4, IECC 2006 to show that this building complies with the mandatory requirements of Sections 401, 402.4, 402.5, 402.6, and 403, IECC 2006 as well as having an annual energy cost that is less than or equal to a standard reference design. Reference: Section 404, International Energy Conservation Code 2006. 3. Clarify the route of the bathroom exhaust duct from the lower level to the building roof and show how it will penetrate the fire-rated floor-ceiling assembly. Reference: Sections 106.3.1and 607.1.1, IMC 2006 and Section 712, IBC 2006. |
09/29/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Denied,see comments under Activity T10CM02528 |
10/05/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
10/13/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/13/2010 | SUE REEVES | OUT TO CUSTOMER | Completed |