Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/26/2010 | TERRY STEVENS | ZONING | REVIEW | Approved | |
08/26/2010 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
08/26/2010 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
08/26/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A-2; FLOOR PLAN: A MINIMUM OF TWO RESTROOMS ARE REQUIRED FOR THE OCCUPANT LOAD PROVIDED. VERIFY. 2. SHEET A-2; FLOOR PLAN: ACCESS TO THE EXIT BY THE OFFICE IS NOT ACCEPTABLE PER IBC SECTION 1014. REARRANGE THE RESTROOM/FITTING AREA/OFFICE/ DRINKING FOUNTAIN GROUPING TO MEET CODE REQUIREMENTS.. 3. SHEET A-2; FLOOR PLAN: THE TWO DOORS OPENING INTO THE HALL (FROM THE TOILET AND FITTING AREA) REDUCE THE HALL TO AN UNACCEPTABLE WIDTH. REVISE THIS CONDITION. |
08/26/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
08/26/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/27/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/27/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | |
08/27/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/27/2010 | DAVE MANN | FIRE | REVIEW | Approv-Cond | Swap doors 2 and 3 to swing in oposite direction, see building comment. |
08/27/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide an appeal to the building official if the IPC is to be used in lieu of the UPC. 2. Provide a complete plumbing plan, including a plan view of the water, waste, and vent piping. Coordinate the riser diagram with the fixture arrangement. 3. Provide specifications of the plumbing fixtures and appliances being installed. 4. Provide a detail of the water heater installation, including valves, T&P relief piping, expansion tank, and vacuum relief. 5. If the water heater is to be mounted on a platform, show how the platform is to be constructed an how it is to be connected to the building structure. 6. Show how the temperature of the hot water to the lavatory is to be limited to a maximum temperature of 110 degrees Fahrenheit. |
09/07/2010 | CPIERCE1 | WWM | REVIEW | Needs Review |