Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Permit Number - T10CM02312
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/04/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. STRUCTURAL CALCULATIONS; COVER SHEET ("SOIL"): PER THE CITY OF TUCSON AMENDMENTS TO THE 2006 IBC, SECTION 1805.2 REQUIRES THE DEPTH OF FOOTINGS TO BE 18" BELOW FINISH GRADE TO ACHIEVE 1500 PSF SOIL PRESSURE, OR 12" TO ACHIEVE 1000 PSF SOIL PRESSURE. REVISE NOTE AND CALCULATIONS AS REQUIRED. 2. STRUCTURAL CALCULATIONS; SHEET NO. 2: THE NOTE INDICATES AN ASSUMPTION IS MADE CONCERNING THE ADEQUACY OF THE PT SLAB AT THE UPPER LEVEL CANOPY. PROVIDE A STRUCTURAL ANALYSIS FOR THIS ASSUMPTION. 3. STRUCTURAL CALCULATIONS: PROVIDE A CALCULATION FOR THE NEW FOOTING AT C-6A. 4. STRUCTURAL CALCULATIONS; COVER SHEET ("WIND"): PROVIDE CALCULATIONS INDICATING THE UPLIFT FORCES FROM THE WIND CAN BE IGNORED. 5. SHEET S1; STRUCTURAL NOTES (NOTE 6): PER THE CITY OF TUCSON AMENDMENTS TO THE 2006 IBC, SECTION 1805.2 REQUIRES THE DEPTH OF FOOTINGS TO BE 18" BELOW FINISH GRADE TO ACHIEVE 1500 PSF SOIL PRESSURE, OR 12" TO ACHIEVE 1000 PSF SOIL PRESSURE. REVISE NOTE AND CALCULATIONS AS REQUIRED. 6. SHEET S2; LOWER LEVEL FRAMING PLAN: ARE THE STEEL SUPPORT CABLES REQUIRED FOR THIS AWNING (SIMILAR TO THE UPPER LEVEL FRAMING)? VERIFY. 7. GENERAL: PROVIDE PRODUCT INFORMATION AND SPECIFICATIONS FOR THE SUN SHADE COVER MATERIAL, INCLUDING ALLOWABLE SPANS, STRESSES, PROPERTIES, ETC. 8. GENERAL: PROVIDE TWO SETS OF DRAWINGS FOR APPROVAL. 9. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
11/05/2010 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
11/05/2010 | SUE REEVES | REJECT SHELF | Completed |