Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM02263
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/20/2010 | DAVE MANN | FIRE | REVIEW | Denied | Two exits required. One of the exits depicted on plan passes through storage area. Per 2006 IBC, egress shall not pass through storage rooms(section 1014.2). See exceptions in same section for methods to alleviate this situation. |
| 09/01/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A2.1 (FLOOR PLAN); SHEET A5.1 (PLAN 6): THE PLANS INDICATE A SINGLE DRINKING FOUNTAIN. REVISE. 2. SHEET A2.2; DETAIL 1: PROVIDE THE BRACING SIZE AND SPECIFIC CONNECTION TO THE TOP OF THE WALL AND TO THE BLOCKING ABOVE. PROVIDE THE BLOCKING SIZE AND SPECIFIC CONNECTION TO THE EXISTING STRUCTURE MEMBERS. 3. SHEET A5.1; DETAILS 4 AND 5: LETTERING MUST BE A MINIMUM OF 3/32" IN HEIGHT PER CITY OF TUCSON STANDARDS. REVISE. 4. SHEET A5.1; DETAIL 5 (AT DRINKING FOUNTAIN): REVISE ALL REFERENCES TO ADAAG. 5. SHEET A5.1; ELEVATION 15: PROVIDE DIMENSIONS INDICATING THE SINK/COUNTER ARE ACCESSIBLE AS REQUIRED BY THE 2006 IBC, SECTION 1109. 6. SHEET A6.1; DETAILS SK2 AND SK3: LETTERING MUST BE A MINIMUM OF 3/32" IN HEIGHT PER CITY OF TUCSON STANDARDS. REVISE. 7. SHEET A6.1; DETAIL SK2: THE BEAM DEPICTED IN DETAIL X REFERENCES THE BEAM PER PLAN. THE BEAM WAS NOT LOCATED ON A PLAN. CLARIFY THE SIZE. 8. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
| 09/02/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
| 09/02/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 2. The specified drinking fountain does not meet the accessibility requirements as shown in Section 1109.5, IBC 2006. |
| 09/02/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 09/02/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/02/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/14/2010 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |