Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T10CM01881
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/20/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
07/23/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Please provide deferred submittal summary letter to Mr. LeeRay Hanly for additional fee accessment. 2. Please provide Special Inspector CertificationS for appoval. 3. Calculations sheet 5 calls for DB-9 as TS 6 x 3 x 3/16 @ 8' o.c. whereas the drawings do not size these steel trusses at all. 4. Calculations call for DJ3 to be TS 2 x 2 x 3/16 and drawings do not size these joists at all. 5. At sheet S2.0, C3 is scheduled to be a 2x2x3/16 and the calculations do not show this size anywhere. All plan referenced C-3s should be C-1s? 6. Foundation Plan schedules F3 as 5' square w/ 7#5s whereas the calculations calls for (DF-1) as 6' square w/6#5s. Please clearify. 7. Ditto comment 6 above for Drawing ftg F3 shows 5' square w/7 #5; calculations call for it (DF-3) as 6' square w/ 6#5s. Please calrify 8. Ditto comment 6 above for Drawing ftg F3 shows 5' square w/7 #5; calculations call for it (DF-5) as 6' square w/ 6#5s. Please calrify. 9. There are no calculations for detail 1/S3.1, BREREZEWAY CANOPY FRAMING PLAN. Please clarify. 10. Please review further calculations for drawing coordinations; Bond beam and lintel sizing, Lateral and Shear Wall Design, Wall design, Lateral analysis and Shear wall footing and grade beam design. 11. Further comments may be comming after review of corrected resubmittal. END OF REVIEW |
07/26/2010 | RONALD BROWN | HC | REVIEW | Passed | |
07/27/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
08/03/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
08/03/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide vent piping of sufficient size for the building sewer to comply with Section 904.1, UPC 2006. Vents located upstream from pumps, ejectors, backwater valves, or other devices that obstruct the free flow of gases between the building sewer and the outside atmosphere shall not be used for meeting the required cross-sectional vent area. |
08/03/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
08/03/2010 | ROBERT SHERRY | WATER | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/16/2010 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
08/16/2010 | SUE REEVES | REJECT SHELF | Completed |