Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T10CM01801
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/18/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
11/19/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | Comment not resolved. Tucson Water limits a 2" meter to a maximum demand of 80 GPM. Provide a letter from Tucson Water confirming that the use of a 2" water meter will be allowed for this project (proposed demand of 98 GPM). Reference: Sections 610.2 and 610.12, UPC 2006. |
11/19/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide reference specifications and listing information for the lint interceptor, LT-1. Reference: Sections 103.2.3 and 1012.1, UPC 2006. 2. Provide listing information for the proposed tankless water heaters. If the proposed water heaters are direct vent units, the listing information and the manufacturer's installation instructions shall be available on site. Reference: Sections 301.1.1and 510.2.5, UPC 2006. 3. Coordinate the plumbing design with the plumbing notes and clarify the design intent (e.g. 5-gallon or 385-gallon storage tank, 2 PSI natural Gas or 5 PSI natural gas, two water heater or four water heaters, water heater input of 200 CFH or 400 CFH, etc.). Reference: Section 103.2.3, UPC 2006. 4. Correct the local utility contact information; this is Tucson, not Phoenix, and Pima County Engineering does not have jurisdiction. 5. Provide fixture descriptions for all plumbing fixtures. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). (Note that terminating a temperature and pressure relief into an elevated mop sink is not approved.) Reference: Sections 301.1.1, 401.1, and 608.5, UPC 2006 6. Copper water distribution piping below ground, inside of a building shall have a weight not less than Type L (Note #3/P-4). Reference: Section 604.2, UPC 2006. 7. Show how the proposed hot water recirculation system complies with the requirements of Section 504.6, IECC 2006. 8. Clarify the water pressure calculations; a prominent note calls for a fitting factor of 1.25 but a factor of 1.1 is used instead. Reference: Section A3.4, UPC 2006. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/06/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
12/06/2010 | SUE REEVES | REJECT SHELF | Completed |