Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T10CM01739
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/07/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | As per Eric's review comments |
07/13/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
07/23/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the size of the condensate drains in accordance with Section 307.2.2, IMC 2006, as amended by the City of Tucson. (Note that whenever two or more condensate drains are combined, the minimum size is 1".) 2. Comment not addressed. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference: Table 403.3, IMC 2006. (Note that the background for the women's restroom as shown on sheet M1.1 does not match the architectural floor plan) 3. Comment not addressed. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2006. 4. Provide smoke detectors in the return air duct, upstream of any outside air connections, for all air distribution systems with a capacity greater than 2,000 CFM (e.g. RTU-1). Reference: Section 606.1, IMC 2006. |
07/26/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide listing information for the components of the solar water heating system. Revise the detail as required to show any shut off valves, temperature and pressure relief valves, and vacuum relief valves. Reference: Sections 103.2.3, 608.5, 608.6, and 608.7, UPC 2006. 2. Clarify detail 1/P3.1 with respect to the solar water heating system and the hot water piping arrangement shown in drawings P1.2 and P2.1. Reference: Section 103.2.3, UPC 2006. 3. Provide a design for the mounting shelf for the water heaters along with structural calculations to show that the water heaters are safely supported with adequate access. Reference: Sections 310.0 and 314.5, UPC 2006. 4. Clarify the mounting of the solar panels on the roof; indicate the operating weight of the roof-mounted components. Reference: Sections 103.2.3 and 313.2, UPC 2006. 5. Provide structural details showing how the waste piping can be run in the existing demising wall (south side). Reference: Section 313.2, UPC 2006. 6. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. Reference: Section 101.5.1, UPC 2006. 7. The specified water closets require a minimum pressure (25 PSI) greater than the 15-PSI used in the water pipe sizing calculations. Revise calculations as necessary. Reference: Section 608.1, UPC 2006. 8. Clarify how the waste piping downstream of the laundry can be "run in the wall". Reference: Sections 103.2.3 and 708.8, UPC 2006. 9. Determine the size of the waste water pipes using the fixture units shown in Table 7-3. Reference: Section 703.1, UPC 2006. |
07/27/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | need capcity evaluation by Kurt Stemm 3rd floor- 740-6607 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/30/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
07/30/2010 | SUE REEVES | REJECT SHELF | Completed |