Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM01739
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/25/2010 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
06/25/2010 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
06/29/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
06/29/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Terminate condensate drains in accordance with Section 307.2.1, IMC 2006, as amended by the City of Tucson. 2. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference: Table 403.3, IMC 2006. (Note that the background for the women's restroom as shown on sheet M1.1 does not match the architectural floor plan) 3. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2006. 4. Revise the size of the dryer exhaust duct per the manufacturer's specification (M1.1 and M1.2). (Detail 2/M3.1 is correct). Reference: Sections 504.1, 504.2, and 504.4, IMC 2006. |
06/29/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A1.1; FLOOR PLAN: PROVIDE STRUCTURAL CALCULATIONS AND DETAILS AS REQUIRED FOR WATER HEATER PLATFORM. |
06/29/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/29/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
06/29/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
06/29/2010 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
06/29/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Approved | |
07/07/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED CAPACITY REVIEW- KURT STEMM- 740-6607 |
07/07/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/07/2010 | SUE REEVES | OUT TO CUSTOMER | Completed |