Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T10CM01737
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 07/28/2010, The submittal can not be approved until the Development Plan and Drainage Report are approved. |
| 07/30/2010 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED APPROVED DP. SITE PLAN TO MATCH |
| 07/30/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | Tucson Water limits a 1" meter to a maximum demand of 25 GPM. Provide a letter from Tucson Water confirming that the use of a 1" water meter will be allowed for this project. Reference: Sections 610.2 and 610.12, UPC 2006 |
| 08/04/2010 | TERRY STEVENS | ZONING | REVIEW | Denied | 08/04/2010 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |