Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10CM01599
Parcel: 10706069B

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T10CM01599
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/15/2010 MARTIN BROWN FIRE REVIEW Approved
06/21/2010 RONALD BROWN ZONING HC REVIEW Approved
06/21/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. All deferred submittals (Metal building) require a summary letter sent to Mr. LeeRay Hanly for aqpproval and additional fee accessment.
2. Provide completed Special Inspection Certificates.
a. There are several more inspections required other than what was summarized on Sheet S-0. Please review the listing provided and provide approval and/or comments.
3. Please show slope of roof on plans.
END OF REVIEW
06/21/2010 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
06/22/2010 LOREN MAKUS ENGINEERING REVIEW Denied The building plans will be reviewed after the development plan has been approved.
06/24/2010 ROBERT SHERRY WATER REVIEW Denied Provide the referenced civil drawings that show the water service to the proposed buildings. Reference: Section 103.2.3, UPC 2006 and Chapter 27, Article V, Section 27-76 (a), Tucson Code. http://www.tucsonaz.gov/water/docs/backflow-ord.pdf
06/25/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide information regarding the type of operations to be conducted in the blast room, the materials to be used, and the expected material concentrations. Reference: Sections 510, 511.1.1, and 511.2, IMC 2006.
2. Installation of the paint booth will require a separate permit.
06/25/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006.
2. Provide sizing information for the roof gutters and downspouts. Reference: Section 1101.11, UPC 2006.
06/29/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project:930 W Glenn St, T10CM01599
Paint and Blast Building


In order to review electrical plans efficiently,please provide the the following information:

1. Provide a summary of the operation of the business including the following,

A. The types of items to be blasted and painted,
B. The type of materials to be used in the operation such as paint etc,
C. How will the materials be stored, and how will they be mixed (paint).
D. Are the materials considered flamable ?
E. Is the Paint Booth listed or labeled, or approved by any Testing Facility ? Provide information on this.
F. Provide shaded areas considered Hazardous, either as Class 1 or Class 11, Division 1 or 2 per 2005 NEC 516, even though they may not have any electrical wiring or equipment.

Since booh permits for the Office - Shop, and Paint Building are on the same set of plans, items above to be provided for review prior to issuing either of the permits.


RT Majuta, Elect Pln Ck,
PDSD, City of Tucson,
6/29/10
Ray.Majuta@tucsonaz.gov
07/09/2010 TERRY STEVENS ZONING REVIEW Denied 07/09/2010

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.
07/09/2010 GERRY KOZIOL WWM REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
07/19/2010 GERARDO BONILLA OUT TO CUSTOMER Completed
07/19/2010 SUE REEVES REJECT SHELF Completed