Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T10CM01598
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/17/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The development plan must be approved before the building permit can be approved. |
08/19/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL 1. The Special Inspection Certifications were received and approved. There are however, several additional inspections identified in the Conditions folder that are not provided for in the received certifications. Please review the summary and provide the additional certuifications as required. If you feel that any of these inspections are not required, please clarify in writing. SHEET T-1 2. In the General Building Summary, the square footage shown for building "A" does not include the second floor square footage. Please revise. END OF REVIEW |
08/23/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/23/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
08/23/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
09/08/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
09/10/2010 | TERRY STEVENS | ZONING | REVIEW | Denied | 07/09/2010 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |