Permit Number: T10CM01598
Parcel: 10706069B

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T10CM01598
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/17/2010 LOREN MAKUS ENGINEERING REVIEW Denied The development plan must be approved before the building permit can be approved.
08/19/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied GENERAL
1. The Special Inspection Certifications were received and approved. There are however, several additional inspections identified in the Conditions folder that are not provided for in the received certifications. Please review the summary and provide the additional certuifications as required. If you feel that any of these inspections are not required, please clarify in writing.
SHEET T-1
2. In the General Building Summary, the square footage shown for building "A" does not include the second floor square footage. Please revise.
END OF REVIEW
08/23/2010 ROBERT SHERRY WATER REVIEW Approved
08/23/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
08/23/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
09/08/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
09/10/2010 TERRY STEVENS ZONING REVIEW Denied 07/09/2010

Development Services Department
Zoning Review Section

Terry Stevens
Lead Planner

Comments:

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.