Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: CELL TOWER/ANTENNAS
Permit Number - T10CM01585
Review Name: CELL TOWER/ANTENNAS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/17/2010 | MARTIN BROWN | FIRE | REVIEW | Approved | |
06/17/2010 | Michael Wyneken | PLANNING-CITY HALL | REVIEW | Approved | |
06/18/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T10CM01585 New MonoPalm 4415 E. Grant. TRANSMITTAL DATE: June 18, 2010 1. The Cell Tower plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Provide a copy of the site plan that is referenced under the "PARKING CALCULAITONS **". 3. Provide a setback dimension from the proposed 8' high block wall enclosure to the east property line. Per LUC Section 3.2.6.4, perimeter yard indicator "CC" the required perimeter yard to the east property line is the height of the structure or 8'-0". 4. Per D.S. 3-05.2.1.3 When the side(s) of a parking space abuts any vertical barrier over six (6) inches in height, other than a vertical support for a carport, the required width for the space is ten (10) feet to provide extra width to allow passengers to enter and exit the vehicle on the side where the barrier exists. That said provide a width dimension for the vehicle parking space directly north of the equipment enclosure so that the requirements of D.S. 3-05.2.1.3 can be verified. 4. Zoning will re-review the Cell Tower plan on the next submittal to insure compliance with the above comments. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\celltower\t10cm01585.doc |
06/30/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET 06; DETAIL D04: PROVIDE STRUCTURAL CALCULATIONS FOR THE CMU WALL AND FOOTING. 2. SHEET 13; FABRIC SUPPORT PLAN: PROVIDE STRUCTURAL CALCULATIONS FOR THE SHADE SCREEN SUPPORTS AND ANCHORS. 3. GENERAL: SPECIAL INSPECTION CERTIFICATE MUST LIST THE NAMES OF EACH INSPECTOR FOR THE VARIOUS CATEGORIES. 4. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
07/06/2010 | BRIAN HEFFERNAN | COMMUNICATIONS | REVIEW | Approved | |
07/14/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/28/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
07/28/2010 | SUE REEVES | REJECT SHELF | Completed |