Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM01445
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/26/2010 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 05/26/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide information on the sequence of operation for the restroom exhaust fans to show that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2006. |
| 05/26/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the connection of the mounting shelf for the water heater to the building along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 2. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006. |
| 05/26/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | Verify the size and location of the water meter and backflow preventer serving the two building. |
| 05/27/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/27/2010 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 05/27/2010 | GBONILL1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 05/27/2010 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
| 05/27/2010 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/27/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
| 05/27/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/27/2010 | RONALD BROWN | ADA | REVIEW | Passed |