Permit Number: T10CM01324
Parcel: 110162860

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM01324
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/14/2010 SREEVES1 ADA REVIEW Passed
05/14/2010 LOREN MAKUS ENGINEERING REVIEW Approved
05/14/2010 DAVE MANN FIRE REVIEW Approved
05/18/2010 GERRY KOZIOL WWM REVIEW Approved
05/24/2010 ERIC NEWCOMB ZONING HC REVIEW Denied 1. SEE BUILDING COMMENTS.
05/24/2010 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A2.1; DIMENSION PLAN: PROVIDE ENLARGED PLANS ON THE DRAWINGS OF BOTH RESTROOMS, INDICATING ALL ICC/ANSI A117.1-2003 REQUIREMENTS ARE MET.
2. SHEET A2.1; RESTROOM 12: VERIFY SECTION 604.3.2 OF THE ICC/ANSI A117.1-2003 IS MET. IT APPEARS THE DOOR SWING OVERLAPS THE WATER CLOSET REQUIRED CLEARANCE.
3. SHEET A2.1; RESTROOM 25: VERIFY FIGURE 404.2.3.1(b) OF THE ICC/ANSI A117.1-2003 IS MET (MANEUVERING CLEARANCE OF 12" IS REQUIRED ON THE PUSH SIDE IF THE DOOR CLOSER AND LATCH ARE BOTH PROVIDED).
4. SHEET A2.1; DIMENSION PLAN: VERIFY THE LOCATION OF THE HIGH/LOW DRINKING FOUNTAIN (OR SINGLE POINT OF USE DISPENSER).
5. SHEET A7.1; ELEVATION 5: SINKS AND WORK SURFACES IN THE BREAK ROOM SHALL MEET SECTIONS 1109.3 AND 1109.11 OF THE 2006 IBC. VERIFY.
6. SHEET M1.2; ROOF PLAN: ARE THE NEW CONDENSING UNIT WEIGHTS NEW LOADS ON THE ROOF? IF REPLACEMENT UNITS, HOW DO THE NEW WEIGHTS COMPARE TO THE ORIGINAL WEIGHTS? PROVIDE STRUCTURAL CALCULATIONS AS REQUIRED TO ENSURE EXISTING ROOF STRUCTURE CAN ADEQUATELY SUPPORT THE NEW UNITS.
7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
05/24/2010 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
06/07/2010 RMYERS1 WATER REVIEW Approved
06/07/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Show how the fan coils are being connected to the building structure. Reference: Section 302.1, IMC 2006.
2. Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference: Section 307.2.3 IMC 2006.
06/07/2010 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a copy of the shell drawings for reference purposes.
2. Provide for sterilization of the domestic water piping per Section 609.9, UPC 2006.
3. The branch piping sizes called out for the flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6.
4. Providing ½” CW and HW supplies to the service sink is not supported by the water pressure calculations of 4.8 PSI/100 Ft.
06/15/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project: T10CM01324
5983 E Grant Rd
Medical TI

Electrical plans denied :

1. Sheet E1.1, Water Heater, Circuit PC-2,4 should be Circuit P 31,33.
2. Sheet E1.2, Circuit PC-35,37 to FC-3 and 4should go to Panel P.
3. Sheet E1.2, circuits PC should go to Panel P.
4. Missing Maintanance receptacles for roof mounted equipment.
5. Sheet E4.1, Ground electrode conductor to 75 KVA trans to be #4 cu, per 2005 NEC 250-66.
6. The equipment to the main disconnect (200 a, 480 v) should be #4 cu also per 2005 NEC 250-66, 250-102.


Ray T Majuta
C of T, PDSD,
Elect Pln CK
6/15/10
Ray.Majuta@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
06/21/2010 CINDY AGUILAR OUT TO CUSTOMER Completed
06/21/2010 SUE REEVES REJECT SHELF Completed