Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/14/2010 | SREEVES1 | ADA | REVIEW | Passed | |
05/14/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
05/14/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
05/18/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
05/24/2010 | ERIC NEWCOMB | ZONING HC | REVIEW | Denied | 1. SEE BUILDING COMMENTS. |
05/24/2010 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A2.1; DIMENSION PLAN: PROVIDE ENLARGED PLANS ON THE DRAWINGS OF BOTH RESTROOMS, INDICATING ALL ICC/ANSI A117.1-2003 REQUIREMENTS ARE MET. 2. SHEET A2.1; RESTROOM 12: VERIFY SECTION 604.3.2 OF THE ICC/ANSI A117.1-2003 IS MET. IT APPEARS THE DOOR SWING OVERLAPS THE WATER CLOSET REQUIRED CLEARANCE. 3. SHEET A2.1; RESTROOM 25: VERIFY FIGURE 404.2.3.1(b) OF THE ICC/ANSI A117.1-2003 IS MET (MANEUVERING CLEARANCE OF 12" IS REQUIRED ON THE PUSH SIDE IF THE DOOR CLOSER AND LATCH ARE BOTH PROVIDED). 4. SHEET A2.1; DIMENSION PLAN: VERIFY THE LOCATION OF THE HIGH/LOW DRINKING FOUNTAIN (OR SINGLE POINT OF USE DISPENSER). 5. SHEET A7.1; ELEVATION 5: SINKS AND WORK SURFACES IN THE BREAK ROOM SHALL MEET SECTIONS 1109.3 AND 1109.11 OF THE 2006 IBC. VERIFY. 6. SHEET M1.2; ROOF PLAN: ARE THE NEW CONDENSING UNIT WEIGHTS NEW LOADS ON THE ROOF? IF REPLACEMENT UNITS, HOW DO THE NEW WEIGHTS COMPARE TO THE ORIGINAL WEIGHTS? PROVIDE STRUCTURAL CALCULATIONS AS REQUIRED TO ENSURE EXISTING ROOF STRUCTURE CAN ADEQUATELY SUPPORT THE NEW UNITS. 7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS. |
05/24/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/07/2010 | RMYERS1 | WATER | REVIEW | Approved | |
06/07/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show how the fan coils are being connected to the building structure. Reference: Section 302.1, IMC 2006. 2. Provide auxiliary drain pans or secondary drain systems for fan coil units. Reference: Section 307.2.3 IMC 2006. |
06/07/2010 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a copy of the shell drawings for reference purposes. 2. Provide for sterilization of the domestic water piping per Section 609.9, UPC 2006. 3. The branch piping sizes called out for the flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Sections 610.12 and A 6.1, UPC 2006 and IS 3-2003, Section 2.6. 4. Providing ½” CW and HW supplies to the service sink is not supported by the water pressure calculations of 4.8 PSI/100 Ft. |
06/15/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T10CM01324 5983 E Grant Rd Medical TI Electrical plans denied : 1. Sheet E1.1, Water Heater, Circuit PC-2,4 should be Circuit P 31,33. 2. Sheet E1.2, Circuit PC-35,37 to FC-3 and 4should go to Panel P. 3. Sheet E1.2, circuits PC should go to Panel P. 4. Missing Maintanance receptacles for roof mounted equipment. 5. Sheet E4.1, Ground electrode conductor to 75 KVA trans to be #4 cu, per 2005 NEC 250-66. 6. The equipment to the main disconnect (200 a, 480 v) should be #4 cu also per 2005 NEC 250-66, 250-102. Ray T Majuta C of T, PDSD, Elect Pln CK 6/15/10 Ray.Majuta@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/21/2010 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
06/21/2010 | SUE REEVES | REJECT SHELF | Completed |