Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T10CM01309
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/22/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 07/22/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
| 07/28/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Mr Heads T10CM01309 Building Plan (2nd Review) TRANSMITTAL DATE: July 28, 2010 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan.. Please submit two copies of the approved and stamped site plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10cm01309.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 08/02/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comment not resolved; an economizer alone may not allow the heat pump to handle 100% outside air. Verify with the heat pump manufacturer that the existing A/C unit will be able to supply essentially 100% outside air to the space on a design day (cooling). Reference: Section 304.1, IMC 2006. |
| 08/02/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the size of the indirect waste piping that exceeds 5'-0" in length to be the minimum size allowed per Table 7-5, UPC 2006. Reference: Sections 703.0 and 803.0, UPC 2006. 2. Provide a full-sized vent from downstream of the backwater valve to comply with Section 904.1, UPC 2006. Vents located upstream from pumps, ejectors, backwater valves, or other devices that obstruct the free flow of gases between the building sewer and the outside atmosphere shall not be used for meeting the required cross-sectional vent area. |
| 08/02/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/18/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/19/2010 | SUE REEVES | OUT TO CUSTOMER | Completed |
| 08/19/2010 | SUE REEVES | REJECT SHELF | Completed |