| 05/14/2010 | DAVE MANN | FIRE | REVIEW | Approved | |
| 05/18/2010 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 05/18/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Mr Heads T10CM01309 Building Plan (1st Review) TRANSMITTAL DATE: May 18, 2010 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan.. Please submit two copies of the approved and stamped site plan with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10cm01309.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: |
| 05/21/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 05/25/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | As per Section 3406.1, the change in occupancy classification of this project requires full building code compliance. 1. Ditto ZONING Comment number 2. Can not determine if the two exits, one North and the other South West, are infact legal exits onto another owner's property and if they exit on top of a parked car or trash dumpster. Please clearify. 2. The North rear exit is not accessible. Needs to have a ramp to outside grade at no more than 1:12 slope. 3. Please provide a complete 2006 IBC Code analysis: a. Please include an occupant load calculation including the custom glass retail facility due to joint use of toilets and rear exit way. b. Please provide a toilet fixture calculation using the combined occupancies of all three areas. c. Please clarify exiting requiremnets with total occupant load of all three areas. 4. Why are steps and landings shown at both new entrances to the bar area from the patio on the Key Plan of sheet S1? a. Please clarify the grade elevation changes through all required exits. Show compliance with ICC (ANSI 117.1) Section 303. 5. The accessible clearance spaces provided in the corridor as you enter the toilet rooms are non compliant with ICC (ANSI 117.1), Section 404.2.3.1 and figure 404.2.3.1 (b). 6. The corridor width is non compliant with 2006 IBC, Section 1017.2 7. All toilets must be accessible. Please provide large scale floor plans of all toilets and interior elevations showing all critical accessible requirements. 8. As per 2006 IBC, Section 1108.2.8.1, the dining area and bar must have 5% accessible seating spaces. 9. Identify all required exits and provide exit lights at all required exits as per 2006 IBC. Section 1011.1. END OF REVIEW |
| 05/26/2010 | RONALD BROWN | ZONING HC | REVIEW | Denied | See Commerical-Building comments. |
| 06/07/2010 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a letter from Tucson Water confirming that the use of a 5/8" water meter will be allowed for this project (19.5 fixture units equates to a demand of 14 GPM). Note that the fixture units for the water closets are greater than shown on the drawings due to the assembly occupancy and a public service sink has 3 fixture units, not 2 fixture units. |
| 06/07/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Appliances (e.g. ice makers) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Table 6-3, UPC 2006 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 602.3, 603.0, and Table 6-2, UPC 2006. 2. Revise the water pressure calculations, using the minimum available water pressure. Reference: Sections 610.1, 610.7 (5), and A1.1, UPC 2006. 3. Provide the size of the existing wall cleanout near the east end of the new bar. Reference: Section 707.11, UPC 2006. 4. Provide a trap for the indirect waste piping from the sanitizing compartment of the 3-compartment sink, the ice machine, and for the indirect waste piping from the soda rack. Show the size of the indirect waste piping from the soda rack. Reference: Section 803.0, UPC 2006. 5. Provide a trap and vent for the indirect waste piping from the beer taps. Show the size of the indirect waste piping from the beer taps. Reference: Section 803.0, UPC 2006. |
| 06/07/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Clarify how the existing A/C unit will be able to supply essentially 100% outside air to the space on a design day (cooling). Reference: Section 304.1, IMC 2006. |
| 06/15/2010 | LEERAY HANLY | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1) NEW PATIO PATIO SPACE APPEARS TO BE LARGELY ENCLOSED SO BY DETERMINATION OF THE BUILDING OFFICIAL EMERGENCY EGRESS LIGHTING SHALL BE REQUIRED. PLEASE PROVIDE EMERGENCY EGRESS ILLUMINATION PER IBC 1006.3.1 & 1006.3.5. |