Permit Number: T10CM01245
Parcel: 111050770

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T10CM01245
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/06/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied RESUBMITTAL COMMENTS:

10. Because no Special Inspections were listed by the structural engineer as per the 2006 IBC, Section 1704.1.1., Inspections were added in the Conditions Menu of this Permit application. Please have the structural engineer review this list and submit the appropriate completed special Inspection Certifications. If he feels that this list should be adjusted, please submit changes in writing,.

NON-RESPONSIVE, NO COMMENTS FROM STRUCTURAL ENGINEER INCLUDED WITH RESUBMITTAL AND NO SPECIAL INSPECTION CERTIFICATIONS SUBMITTED FOR APPROVAL

END OF REVIEW
12/07/2010 RONALD BROWN ZONE H/C REVIEW Approved
12/08/2010 BIANCA RAMIREZ ENGINEERING REVIEW Denied Building Plans cannot be approved until site plan had been approved.
12/21/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Comment not resolved. The specified lavatory valve will allow the hot and cold water proportions to be set but does not limit the water temperature. Provide information to show how the outlet temperature of the hot water is to be limited to 110 degrees at the lavatories. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
12/21/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Comment not resolved. The maximum U-value for a swinging door is 0.70, not 0.75 BTU/F Ft^2 H. The use of a SHGC of 0.40 requires a minimum projection factor of 0.5. The projection factor is defined as the length of the overhang from the plane of the window divided by the distance of the overhang to the sill of the window. Only one of the new windows appears to meet that criterion. Show that the new addition complies with the energy code requirements for Pima County < 4,000 feet. Reference: Sections 101.4 and 104.2, International Energy Conservation Code 2006.
2. The submitted ventilation calculations, based on ASHRAE Standard 62.1-2004 are incomplete. You have used the default occupant density to determine the number of occupants for education, classroom (ages 5 - 8) and found the required ventilation per person but you did not include the required ventilation for the room area (see Table 6-1, Area Outdoor Air Rate, Ra).
12/27/2010 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Outer Limits School - Classroom Addition
T10CM01245
Building Plan (2nd Review)

TRANSMITTAL DATE: December 07, 2010

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan.. Please submit two copies of the approved and stamped site plan with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t10cm01245.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:

Final Status

Task End Date Reviewer's Name Type of Review Description
01/03/2011 CINDY AGUILAR OUT TO CUSTOMER Completed
01/03/2011 SUE REEVES REJECT SHELF Completed