Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10CM01237
Parcel: 11105076B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM01237
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/11/2010 GERRY KOZIOL WWM REVIEW Approved
05/21/2010 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Outer Limits School - Classroom Addition
T10CM01237
Building Plan (1st Review)

TRANSMITTAL DATE: May 21, 2010

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan.. Please submit two copies of the approved and stamped site plan with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t10cm01237.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
05/25/2010 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A1.0: PROVIDE A COST BREAKDOWN ON THIS SHEET FOR THE 20% MAXIMUM OF THE PROJECT COST SPENT ON ACCESSIBILITY ISSUES PER THE IBC SECTION 3409.7.
2. SHEET S1.0; GENERAL FOUNDATION NOTES: NOTE 3 INDICATES FOUNDATIONS SHALL BEAR 12" MINIMUM INTO UNDISTURBED SOIL, AND NOTE 7 INDICATES AN ALLOWABLE SOIL BEARING VALUE OF 1500 PSF. HOWEVER, SECTION 1805.2 OF THE CITY OF TUCSON AMENDMENTS TO THE 2006 IBC INDICATES A MINIMUM OF 18" INTO UNDISTURBED SOIL FOR A MAXIMUM ALLOWABLE FOUNDATION PRESSURE PER IBC TABLE 1804.2 (1500 PSF). COORDINATE.
3. SHEET S1.0: PROVIDE COMPLETE STRUCTURAL CALCULATIONS FOR THE VERTICAL AND LATERAL ANALYSIS OF THE BUILDING.
4. GENERAL: ALL DEFERRED SUBMITTALS MUST BE APPROVED IN WRITING BY LEERAY HANLY PRIOR TO REVIEW OF THE SUBMITTALS.
5. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.
05/27/2010 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Approved
05/27/2010 ERIC NEWCOMB ZONING HC REVIEW Denied 1. SEE BUILDING COMMENTS.
06/08/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Show that the addition can be maintained at 68 degrees Fahrenheit on a design day.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/10/2010 DELMA ROBEY OUT TO CUSTOMER Completed
06/10/2010 SUE REEVES REJECT SHELF Completed