Permit Number: T10CM01057
Parcel: 12901018L

Address:
153 S PLUMER AV

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM01057
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2010 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: May 5, 2010
SUBJECT: 153 S Plumer Ave
TO: Jim Watson
LOCATION: 153 S Plumer Ave, T14S, R14E, Section 17, Ward 6
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: T10CM01057 (First Review)


RESUBMITTAL REQUIRED: Site Plan

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. Please address the following review comments prior to the next submittal.

Please include a response letter to the comments with the corrected copies of the site plan.
Site Plan:

1. Please provide property description per D.S. 2-02.2.1.A.2.
2. Please label lot bearings for west and northeast property line per D.S. 2-02.2.1.A.5
3. Please provide location, type, size, and height of existing and proposed signage D.S. 2-02.2.1.A.13. Signage should be provided to clearly indicate one way areas.
4. DS Sec.2.02.2.1.A.16: Provide roof drainage arrows and locations of all concentration points. Specifically show roof down spout locations proposed buildings at pedestrian circulation areas. A detail for the dimension of the proposed scuppers that are used for collecting onsite roof drainage at all pedestrian sidewalk is required; refer to City of Tucson details. Any scuppers proposed under the sidewalk will be designed and constructed to convey the 10-year flood flow.
5. D.S. Sec.2-02.2.1.A.17: It appears that cut and fill will not be occurring for the proposal. However, as part of the site submittal requirement estimated cut and fill quantities are required to be indicated on the plans so that it is clear to the inspector that no cut in fill is to be taking place. If not cut and fill is taking place indicate the quantity of zero (0) on the plan. Estimated cut and Fill: Cut = 0 and Fill = 0 will suffice.
6. Please label R.O.W. dimensions as existing or future. If the distance is the same for both the existing and future please indicate accordingly on site plan.
7. Provide the site plan activity number in the bottom right hand corner of each sheet in the lower right hand corner.
8. Show refuse container location, size, and access thereto fully dimensioned per D.S. 2-02.2.1.32 and D.S. 6-01.0.
9. A permit or a private improvement agreement will be necessary for any work performed within the right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
10. Add note: "Depress all landscaped areas 6" maximum for water harvesting".
11. Verify that all easement of record have been graphically shown on the plan together with recording docket and page reference per D.S. 2-02.2.1.20.
12. Additional comments may be forthcoming.

If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov

Bianca C. Ramirez
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
04/23/2010 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Aviva Children Services - Office Bldg.
T10CM01057
Building Plan (1st Review)

TRANSMITTAL DATE: April 23, 2010

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning cannot approve the building tenant improvement until the site plan is approved.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t10cm01057.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED:
04/27/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied COVER SHEET
1. Please provide list of current Codes used for this project
2. Toilets Required should read 4 each not 3.
3. Drinking Fountions Required should read 3 not 2.
SHEET A2.0
4. Wall type legend showns one layer gypsum board where wall section details 1 and 3/A4.0 through this room on Sheet A3.1 show 2 layers of gypsum board. Please clarify.
SHEET A3.1
5. Please provide structural calculations for the J-1 and J-2 ceiling framing members.
6. There are several detail reference marks on the plan that do not have complete reference numbers. Please provide.
SHEET A5.0
7. At detail 8, please provide spout mounting height dimensions for both drinking fountains as per ICC (AANSI) 117.1, Section 602.4
8. Urinal alcoves do not comply with ICC (ANSI) 117.1, Section 305.7.
STRUCTURAL REVIEW
SHEET A2.2
9. At note 1, please clarify if the 400# truss design load is a point load per truss or per roof top unit?
10. Please provide structural analysis and calculations for the three new, roof top units 7, 9, and 10 placed directly above the existing columns.
11. Calculations provide beam analysis for beams B3 and B4. New columns have been added at beams B3, B4 and B7. No analysis for B7 is provided. No analysis for B1, B2, B5, B6, and B8. Please provide alanysis for the entire roof structure.
12. Please provide structural calculations for the wall mounted water heater/s.
GENERAL
13. Please provide a letter summary of all deferred submittals to Mr. LeeRay Hanly.
END OF REVIEW
04/28/2010 RONALD BROWN ZONING HC REVIEW Denied Reference Building Folder for comments.
05/06/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006.
05/06/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
05/06/2010 ROBERT SHERRY WATER REVIEW Approved
05/13/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/20/2010 CPIERCE1 OUT TO CUSTOMER Completed
05/20/2010 SUE REEVES REJECT SHELF Completed