Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/14/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a vacuum relief for the storage-type water heater located above the fixture outlets. Reference: Section 608.7, UPC 2006. 2. Provide an end of run cleanout at the mop sink, SS1. Reference: Section 707.4, UPC 2006. 3. Provide protection of the trap seals for all floor drains subject to infrequent use. Reference: Sections 1007.0 and 1007.1, UPC 2006, as amended by the City of Tucson. |
04/14/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference: Section 302.1, IMC 2006. 2. Show the size, routing, and termination of the condensate drains. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006. 3. Revise the sequence of operation for the restroom exhaust fans (i.e. switched with lights) so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (3), IMC 2006. 4. Smoke detectors shall be located upstream of any outside air connections. Reference: Section 606.2.1, IMC 2006. |
04/14/2010 | MARTIN BROWN | FIRE | REVIEW | Approved | |
04/15/2010 | RICHARD JIROUDEK | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Plans Denied for the following: 1. Revise sequence of operation for restroom exhaust fan. See mechanical review comment #3. Needs to operate when air being supplied to restroom. 2. Revise sheet E2 to clarify installation of New 45KVA xfmr or relocating existing 30KVA xfmr. 30KVA xfmr not of sufficent size to supply calculated loads. 3. Provide disconnecting means for water heater. Refrence 2005 NEC 422.31(B). Rich Jiroudek Electric Plns Exmn |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/27/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |