Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T10CM00792
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/29/2010 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
03/29/2010 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
03/30/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: T10CM00792 Electrical denied for following: 1. Circuitry incorrect , does not match panel schedule. 2. Provide a diagram of how interlock is to be made. 3. Again, circuitry incorrect for exhaust fan and cooler. 4. Identify cooler disconnect as cooler diconnect. Ray T Majuta Elect Plan Ck 3/30/10 520/837/4988 |
03/30/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide a design for the proposed Type I hood system, including the materials of construction for the hod, grease duct, and the wall covering around the hood. 2. Show that the dimensions of the hood, grease duct, the equipment under the hood, the exhaust fan, and the operation of the hood comply with the requirements of sections 506 and 507, IMC 2006. 3. Provide a design for the make-up air system, including the equipment specifications, the balancing requirements, and the materials of construction. 4. Clarify where detail A, sheet 3 applies. 5. Clarify the nature of the roof above the Type I hood. Is it a flat roof or sloped, where is the fan to be located, and are guards being installed per section 304.10, IMC 2006? |
03/30/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need to recalculate occupancy loads for both suites that share the same toilets. Insure toilet count is as per 2006 IBC, Chapter 29. 2. Needs to provide completed Code Analysis Data. |
03/30/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/30/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Provide a design for the new natural gas service. Show the loads of all gas-fired equipment, the developed pipe lengths, materials of construction. |
03/30/2010 | MARTIN BROWN | FIRE | REVIEW | Approved | |
03/30/2010 | RONALD BROWN | ADA | REVIEW | Passed | |
03/30/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/30/2010 | RONALD BROWN | ZONING HC | REVIEW | Denied | |
04/13/2010 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/13/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |