Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10CM00792
Parcel: 124050600

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM00792
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/29/2010 MICHAEL ST. PAUL ZONING REVIEW Approved
03/29/2010 BIANCA RAMIREZ ENGINEERING REVIEW Approved
03/30/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied Project: T10CM00792


Electrical denied for following:
1. Circuitry incorrect , does not match panel schedule.
2. Provide a diagram of how interlock is to be made.
3. Again, circuitry incorrect for exhaust fan and cooler.
4. Identify cooler disconnect as cooler diconnect.

Ray T Majuta
Elect Plan Ck
3/30/10
520/837/4988
03/30/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide a design for the proposed Type I hood system, including the materials of construction for the hod, grease duct, and the wall covering around the hood.
2. Show that the dimensions of the hood, grease duct, the equipment under the hood, the exhaust fan, and the operation of the hood comply with the requirements of sections 506 and 507, IMC 2006.
3. Provide a design for the make-up air system, including the equipment specifications, the balancing requirements, and the materials of construction.
4. Clarify where detail A, sheet 3 applies.
5. Clarify the nature of the roof above the Type I hood. Is it a flat roof or sloped, where is the fan to be located, and are guards being installed per section 304.10, IMC 2006?
03/30/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. Need to recalculate occupancy loads for both suites that share the same toilets. Insure toilet count is as per 2006 IBC, Chapter 29.
2. Needs to provide completed Code Analysis Data.
03/30/2010 ROBERT SHERRY WATER REVIEW Approved
03/30/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Provide a design for the new natural gas service. Show the loads of all gas-fired equipment, the developed pipe lengths, materials of construction.
03/30/2010 MARTIN BROWN FIRE REVIEW Approved
03/30/2010 RONALD BROWN ADA REVIEW Passed
03/30/2010 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/30/2010 RONALD BROWN ZONING HC REVIEW Denied
04/13/2010 GERRY KOZIOL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/13/2010 DELMA ROBEY OUT TO CUSTOMER Completed