Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T10CM00544
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/26/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
| 04/26/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | Conditional approval provided for Deferred Submittals letter to LeeRay Hanly. |
| 04/27/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Comment not resolved; the building drawings do not show the same amount of insulation for the roof and walls as is shown in the calculations. Revise the energy code analysis, coordinating the building components used in the analysis with those shown on the drawing. Reference: Section 502, IECC 2006, as amended by the City of Tucson. |
| 04/27/2010 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/27/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide vent piping of sufficient size to comply with Section 904.1, UPC 2006. Vents located upstream from pumps, ejectors, backwater valves, or other devices that obstruct the free flow of gases between the building sewer and the outside atmosphere shall not be used for meeting the required cross-sectional vent area. 2. Provide roof drainage for the walk-in coolers. All roof areas shall be drained by roof drains, scuppers, or gutters. Reference: Section 1101.11.1, UPC 2006. 3. The roof scupper draining area 4 (1046 SF) is undersized and lacks any overflow capacity. See Section 1101.11.2.1 for sizing information of roof scuppers. Reference: Section 1101.11, UPC 2006. 4. Clarify the termination of the roof drain and overflow drain. Show the roof drain and overflow drain on the roof plan. |
| 04/27/2010 | RICHARD JIROUDEK | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Plans denied for the following: 1. Provide electrical distribution system capable of interrupting available fault current. 2005 NEC 110.9. If using series rating provide information required by 2005 NEC 110.22 and 240.86(A) or 240.86(B). 2. None of the loads on panel K2 can be considered as kitchen equipment and NEC 250.56 does not apply. See comment #3 from previous review comments. Rich Jiroudek Elect Plns Exmn 520-954-0161 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/29/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 04/29/2010 | CPIERCE1 | REJECT SHELF | Completed |