Permit Number: T10CM00544
Parcel: 12218257A

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T10CM00544
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/10/2010 MARTIN BROWN FIRE REVIEW Approved
03/10/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. Detail 1/1.6 shows reception counter and entrance decor elevation references to 10 and 11/1.5. Sheet 1.5 details end at 9.

T10CM00544
REVIEW COMMENTS
ERIC NEWCOMB

2. ALL DEFERRED SUBMITTALS MUST BE SUBMITTED TO AND APPROVED BY LEERAY HANLY.
3. SHEET 1; KEY NOTE 5: NOTE INDICATES THE TRASH ENCLOSURE IS SHOWN ON SHEET 3. THIS SHEET DOES NOT OCCUR IN THIS SET. CLARIFY AND COORDINATE WITH STRUCTURAL SHEET S0.3.
4. SHEET 1; KEY NOTE 25: CLARIFY THE NOTE THAT INDICATES AN 18'-0" PARAPET ALONG THE WEST WALL.
5. SHEET 1; KEY NOTE 36: THE NOTE INDICATES A NEW RETAINING WALL. NO CALCULATIONS OR DRAWINGS WERE FOUND IN THE STRUCTURAL SUBMITTAL. CLARIFY AND COORDINATE WITH STRUCTURAL.
6. SHEET 1; GENERAL KEY NOTES: THERE ARE SEVERAL REFERENCES TO SHEETS NOT INCLUDED IN THIS SUBMITTAL. CLARIFY.
7. GENERAL: PROVIDE WRITTEN RESPONSES TO ALL REVIEW COMMENTS.

END OF REVIEW
03/10/2010 JASON GREEN ENGINEERING REVIEW Approved
03/10/2010 RONALD BROWN ZONING HC REVIEW Denied 1. Please show compliance with 2006 IBC, Section 1108.2.8 and ICC (ANSI) 117.1, Section 902 accessible dining seating requirements.
2. Please show compliance with ICC (ANSI), Section 904.3 for reception counter accessibility requirements.
3. Please show compliance with ICC (ANSI), Section 1109.11 for the bar area accessibility requirements.
03/11/2010 RICK MYERS PLUMBING-COMMERCIAL REVIEW Denied 1. Drawings provided by the kitchen equipment suppliers are typically un-sealed shop drawings are not a substitute for sealed design drawings. Reference: Section 103.2.2, UPC 2006.
2. All plumbing fixtures and fittings shall be listed or labeled by a nationally-recognized, accredited conformity assessment company (e.g. UL, ETL, UPC, etc). Reference: Section 301.1.1, UPC 2006.
3. Provide material standards for all plumbing fixtures being provided by others. Reference: Section 401.1, UPC 2006.
4. Appliances (e.g. ovens, ice makers, etc) to be directly connected to the water supply system that do not have listed, integral backflow preventers or integral air gaps conforming to Table 6-3, UPC 2006 require backflow prevention. Specify the type of backflow prevention device required for each water connection. Reference: Sections 602.3, 603.0, and Table 6-2, UPC 2006.
5. Provide a detail for the installation of water heaters WH-1 and WH-2, including the mounting method, vent termination, and valves. Reference: Sections 103.2.3, 314.5, 510.6.2, and 605.5 UPC 2006.
6. Complete the DCW, DHW isometric by including all of the pipe sizes. Reference: Section 103.2.3, UPC 2006.
7. Provide the size of the existing water meter and the existing backflow preventer. Reference: Sections 103.2.3 and 610.1, UPC 2006.
8. Revise the waste and vent isometric to coordinate with the soil, waste, and vent plan (i.e. include the 3" GW branch line serving TD-1, TD-2, and P-4 and its vent). Reference: Section 103.2.3, UPC 2006.
9. The rim elevation of the next upstream sanitary manhole is less than 12" below the first floor elevation. Provide backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson.
10. Provide roof drainage calculations and plans. All roof areas shall be drained by roof drains, scuppers, or gutters. Reference: Section 1101.11.1, UPC 2006.
11. Provide sizing information for the roof scupper. Reference: Section 1101.11, UPC 2006.
12. Revise the roof drain sizing based on a storm of 60-minutes duration and a 100-year return period, i.e. 3" per hour. Reference: Section 1101.11.1 and Table 11-1, UPC 2006.
13. Provide location and sizing information for gutters and downspouts. Reference: Section 1106.0, UPC 2006.
14. Show how the roof drain connects to the downspout.
03/11/2010 RMYERS1 WATER REVIEW Denied 1. Provide an approved site utility plan. Reference: 103.2.3 2006 UPC.
03/12/2010 RICHARD JIROUDEK ELECTRICAL-COMMERCIAL REVIEW Denied Electric plans denied for the following:

1. Provide complete fault current analysis of service and feeders per City of Tucson submittal requirements.

2. Indicate on plan E5 at option for series rating of equipment what label markings should read. NEC 110.22 & 240.86

3. Service and feeder load calculations for motors and hermetic refrigerant motor compressors shall be calculated in accordance with NEC 220.50. NEC 220.56 does not apply.

4. All lighting and sign circuits to be calculated as continous loads. NEC 210.19(A), 210.20(A), & 215.2(A).

5. Provide service receptacle for refrgeration equipment for walkin cooler and freezer. NEC 210.63

Rich Jiroudek
Electric Plns Exmn
520-954-0161
03/16/2010 GERRY KOZIOL WWM REVIEW Approved
03/16/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Revise the energy code analysis, coordinating the building components used in the analysis with those shown on the drawing. Reference: Section 502, IECC 2006, as amended by the City of Tucson.
03/18/2010 TERRY STEVENS ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/19/2010 GERARDO BONILLA OUT TO CUSTOMER Completed
03/19/2010 SUE REEVES REJECT SHELF Completed