Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10CM00441
Parcel: 10609043B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM00441
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/23/2010 STEVE SHIELDS ZONING REVIEW Passed
02/23/2010 BIANCA RAMIREZ ENGINEERING REVIEW Approv-Cond
02/23/2010 ERIC NEWCOMB ADA REVIEW Passed
02/23/2010 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Needs Review
02/23/2010 ERIC NEWCOMB ZONING HC REVIEW Needs Review
02/23/2010 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
02/24/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide calculations demonstrating adequate ventilation. Reference: Section 401.2, IMC 2006.
02/24/2010 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
02/24/2010 ROBERT SHERRY WATER REVIEW Approved
02/24/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide structural justification for the use of a horizontal vent (i.e. a "flat vent") that does not rise vertically to a minimum of 6" above the flood rim of a fixture before it offsets horizontally. Reference: Section 905.3, UPC 2006.
2. Show that the floor of the restroom slopes toward the floor drain. Reference: Section 411.2, UPC 2006.
3. Clarify the CW & HW riser diagram. What is HB2? Are there really two water heaters (WH1 and WH2)? The lavatories are equipped with a thermostatic mixing valve and are scheduled with both CW and HW.
4. The maximum water use for a urinal is 1.0 GPF, per ARS Title 45, Chapter 1, Article 12. (See text at: http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp).
02/25/2010 GERRY KOZIOL WWM REVIEW Denied
02/25/2010 DAVE MANN FIRE REVIEW Approved