Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/WWM
Permit Number - T10CM00405
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/16/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 03/30/2010 | RONALD BROWN | BUILDING-RESIDENTIAL | REVIEW | Denied | FLOOR PLAN 1. Identify ceiling heights in all NEW areas. Note average height at sloped ceiling areas, R305.1. 2. Tub/shower enclosures require nonabsorbent wall surface min. 6’ above the floor and fiber-cement board backing, R307.2, R702.4.2. FOUNDATION PLANS: 3. Note grade away from foundations shall fall min 6” within the first 10’, R401.3. SECTIONS - DETAILS 4. Please note 6" separation of untreated posts or columns above finished grade and 1" above concrete, R319.1.4. 5. Specify wall and ceiling covering. Note: Ceiling gypsum board must be either 5/8" or ½" SAG RESISTANT when applied to ceilings framed at 24" o/c, IRC table R702.3.5 footnote d. 6. At detail 6/A5, thre is a concrete toe down shown at the base of the vent pipe. ELECTRICAL PLANS: 7. Note that light fixtures in clothes closets shall be installed in accordance with E3903.11. 8. Bathrooms require a separate 20-amp circuit with receptacles within 3’ of the basin, E3801.6. 9. Please clarify what happens to the existing circuits remaining when the existing panel box is removed. 10. In both Panel Schedules and on the Electrical Floor Plan, the new Sub-Panel is referred to as Panel "A" where as in the riser diagram, it is referred to as Panel "B". Please coordinate and correct references. 11. Show toilet fixtures in bathrooms. PLUMBING PLANS 12. Show all toilet room fixtures on plan. 13. Provide pressure and temperature relief valve terminating to the exterior facing down between 6 and 24 inches above grade, UPC 608.5. 14. Condensate disposal may not discharge into a plumbing vent, UPC 908.1. 15. Provide a gas line isometric and size the supply pipe for the connected demand. Include the length of line and BTU demand for each appliance, size of each branch, total demand, and total developed length from meter to the most remote appliance on the system, UPC 1217.0 Table 12-8. MECHANICAL PLANS 16. Mechanical shall comply with 2006 IRC chapters 12 - 24. 17. Show supply and return ducts with minimum R-8 insulation, R1103.2.1. 18. Show the condensate line and secondary for HVAC unit, M1411.3. 19. Flues connected to more than one appliance shall be not less than the area of the largest connector plus 50% of the additional connectors. Water heater typical - 3" flue. Furnace - 4" flue. IRC M1805.3. OUTDOOR LIGHTING CODE 20. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in accordance with OLC 3.1.2. Include all exterior fixtures on the property in the calculations. 21. Provide cut sheets for all FCO fixtures showing the angle of cutoff, light emissions and fixture wattage. All other fixtures are assumed to be unshielded (non-FCO style). INTERNATIONAL ENERGY CONSERVATION CODE: 22. Provide a note requiring the insulation certificate shall be posted in the electrical distribution panel before final inspection, N1101.8. END OF REVIEW |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/05/2010 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 04/05/2010 | SUE REEVES | REJECT SHELF | Completed |