Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T10CM00364
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2010 | DAVE MANN | FIRE | REVIEW | Approved | Separate, deferred submittal for underground fuel storage tanks required through Fire department. |
02/23/2010 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/25/2010 | RONALD BROWN | ZONING HC | REVIEW | Passed | Accessibility not applicable |
03/02/2010 | ANDREW CONNOR | ZONING | REVIEW | Denied | 03/02/2010 Development Services Department Zoning Review Section 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. |
03/03/2010 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | For comments see T10CM00365, since these two permits are on the same Plan. Ray T Majuta, Elect Plan Review City of Tucson. 3/5/10 520/837/4988 |
03/05/2010 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. From whence does the water for the air/water dispenser originate? And how does it get to the dispenser? Include size of water line and type of backflow protection to be installed. 2. How is the rain water to be collected on the canopy, and drained to the columns? 3. Show how the canopy drain is connected to the column drains. |
03/05/2010 | RMYERS1 | WATER | REVIEW | Denied | 1. Provide site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006. |
03/10/2010 | GERRY KOZIOL | WWM | REVIEW | Passed | |
03/12/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | The Development Plan must be approved before approval of the building plan. |
03/18/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/26/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |
07/26/2010 | SUE REEVES | REJECT SHELF | Completed |