Permit Number: T10CM00217
Parcel: 128114080

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T10CM00217
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/01/2010 DAVE MANN FIRE REVIEW Approved
02/02/2010 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide information on the sequence of operation for the restroom exhaust fans to show that recirculation of the air from the restrooms will not occur. Reference: Section 403.2.1, IMC 2006.
02/02/2010 GERRY KOZIOL WWM REVIEW Approved
02/03/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide site drawing showing the size, route, and slope of the building sewer. Reference: Section 103.2.3, UPC 2006.
2. The upper terminal cleanout for the water closets is called out as 4" but the waste piping is only 3". Provide cleanouts sized per Section 707.11, UPC 2006. Reference: Section 316.4.1, UPC 2006.
3. Provide 3rd-party listing information for the Gleco plaster trap. Reference: Section 301.1.1, UPC 2006.
4. Modify the pressure loss calculations to include the pressure required at the last fixture. Note that one of the specified fixtures (pressure-assisted water closet) requires a minimum pressure greater than the 15-PSI. Revise calculations as necessary. Reference: Section 608.1, UPC 2006.
5. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006.
6. Revise the site plan to show the rim elevation of the next upstream sanitary manhole and the first floor elevation. Reference: Section 710.1, UPC 2006, as amended by the City of Tucson.
7. Clarify the total connected load for the gas piping system; the total connected load is noted as 225 CFH but the load for the three rooftop units totals 269 CFH. Revise the size of the gas piping as required. Reference: Section 1209.4, UPC 2006.
02/03/2010 ROBERT SHERRY WATER REVIEW Denied Revise the site drawing to show the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006.
02/05/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
02/05/2010 RONALD BROWN ZONING HC REVIEW Approv-Cond Locate the dectectable warning at the face of the parking aisle positioned in the direction of travel.
02/08/2010 SREEVES1 ELECTRICAL-COMMERCIAL REVIEW Needs Review scope of work is changing, customer requested that electric not be review until next workflow.

Final Status

Task End Date Reviewer's Name Type of Review Description
02/08/2010 CINDY AGUILAR OUT TO CUSTOMER Completed
02/08/2010 SUE REEVES REJECT SHELF Completed