Permit Number: T10CM00028
Parcel: 10511061R

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T10CM00028
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2010 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. OK
2. CODE INFORMATION:
a. OK
b. The occupant load for Mercantile are as per 2006 IBC, Table 1004.1.1. Please recalculate load as per these requirements.
RESUBMITTAL COMMENTS:
2.1. ON SHEET A0.01, CODE INFORMATION: OCCUPANCY LOAD FACTOR: 109 OCC PER S.F.; TOTAL OCCUPANT LOAD OF 208 OCCUPANTS AND TOTAL OCCUPANT LOAD AS PER 1 AND 13 SHEET A/2.03 : ALL ARE INCOMPREHENSIBLE.
A. THE ONLY ITEM ABOVE THAT IS REVELANT TO TABLE 1004.1.1 IS DETAIL 17/A2.03 (There is no detail 13 on this sheet) AND IT IS SHY OF 1,278 S.F.
B. PLEASE RECALCULATE YOUR OCCUPANCY LOAD BASE UPON 8,000 S.F. AND TABLE 1004.1.1

DETAIL 1/A2.01
3. Please provide a blow up plan of the EWC nitch showing all dimensions including accessible clearance dimensions as per ICC (ANSI) 117.1, Section 602.2.
RESUBMITTAL COMMENTS:
3.1 THE EWC CLEARANCE SHOW HERE DOES NOT COMPLY WITH ICC (ANSI) 117.1 SECTION 602, FIGURE 602.5.
3.2 THE PARTIAL NEEDS TO BE TO SCALE.
4. The men and women toilet room nos. 104 and 105 are not code compliant. Reference comment 5 below.
RESUBMITTAL COMMENTS:
4.1 PLEASE PROVIDE TOILET PLAN 14/A2.01 TO SCALE.
SHEET 4.01
5. OK
6. OK
7. OK
DETAIL 5c/A5.01
6. OK
MECHANICAL AND ELECTRICAL SHEETS
7. The minimum sized lettering for all sheets is 3/32". Please revise all mech and elect sheets to meet this requirement.
RESUBMITTAL COMMENTS
7.1 PLEASE REDO SHEET E3.0, PANEL SCHEDULES.
8. Please provide a water heater structural support detail and structural calculations.
RESUBMITTAL COMMENTS
8.1 PLEASE PROVIDE THE SIZES FOR ALL SUPPORT MEMBERS AND STRUCTURAL CALCULATIONS FOR DETAIL 3/M4.0
END OF RESUBMITTAL REVIEW
04/21/2010 RONALD BROWN ZONING HC REVIEW Denied REFERENCE BUILDING COMMENTS
04/21/2010 DROBEY1 ELECTRICAL-COMMERCIAL REVIEW Needs Review
04/21/2010 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Show how the proposed water heater platform is to be connected to the building structure. Reference: Section 314.5, UPC 2006.
2. Provide water pressure and water pipe sizing calculations. Reference: Section 610.1, UPC 2006.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/21/2010 DELMA ROBEY OUT TO CUSTOMER Completed