Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T10BU01174
Parcel: 11942006E

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T10BU01174
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/24/2012 ELIZABETH LEIBOLD ENGINEERING REVIEW Denied ENGINEER: Brian Chimera / Paul Iezzi, P.E.
ACTIVITIES: T10BU01174-R, T10OT01657-R
PROJECT: TUSD K-8 Via Ingresso - Mission 3rd Revision to Grading Engineering Review
LOCATION: Ward 1, T14S R13E Section 34
REVIEWER: Elizabeth Leibold, P.E.

SUMMARY: The floodplain use permit and grading plan submittal was received and reviewed for the Revision #3 that including proposed changes to the basins for remedial grading to alleviate ponding issues for this project. Planning & Development Services Department Engineering Division does not recommend approval of the revised grading permit until the following comments are addressed.

GRADING COMMENTS:
1) DS Sec.10-02.1.5, 10-02.2.3.1.6: Provide drainage statement or revised drainage report explaining basin revision. Provide any associated calculations or analysis.
2) Per DS Sec.11-01.16.1.D, EOR shall submit a statement of substantial conformance to said as-built plan and the specifications. The Civil engineer shall provide in the letter the following statements, that the drainage facilities and/or basin(s) were constructed in accordance with the approved plans and City of Tucson standards and codes; and that the basin meets City of Tucson drain down time requirements;
Submit any remaining fees when picking up permits. If you have questions or would like to set up a meeting, call me at 837-4934.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Planning & Development Services Department

Final Status

Task End Date Reviewer's Name Type of Review Description
05/08/2012 CINDY AGUILAR APPROVAL SHELF Completed
05/08/2012 CINDY AGUILAR OUT TO CUSTOMER Completed