Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING
Permit Number - T10BU00084
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/03/2010 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approv-Cond | ENGINEERS: Wood Patel (Phase 1 Grading), WRG (COSTCO) ACTIVITIES: T10BU00083, T10BU00084 PROJECT: Tucson Marketplace D09-0010 Phase 1 Grading & COSTCO at Bridges Grading Re-submittal LOCATION: Ward 5 FEMA: 2237K, Zone X-Unshaded WATERSHED: Mission View Wash Watershed adjacent to Greyhound Wash REVIEWER: Elizabeth Leibold, PE SUMMARY: The revised grading plan submittal was received and reviewed by Planning & Development Services Department Engineering Division. Development Services Department Engineering recommends conditional approval of the grading permit application with the remaining comments addressed on a revised plan set prior to picking up permits. GRADING PLAN COMMENTS: 1) DS Sec.11-01.4.C: address the remaining grading comments: a) Provide elevation benchmark and datum information on a planview on sheets C1 or C2 for a local benchmark for the Wood Patel plan set - benchmark should be shown on sheet C2. b) On Wood/Patel Phase 1 plan, detail N on sheet C15 shall specify type of 8-inch stabilization material. c) Provide copy of agreement authorizing offsite work or label dkt/pg of offsite easement. d) At minimum, one Operator, either the engineer of record or the project manager or owner as listed on the bottom of the second page of the NOI shall sign one of the Operator certifications. Please note that the remaining signatures from the Operators must be on the SWPPP on the site copy of the SWPPP (exhibit or report) at or before commencement of construction. (Part IV.C.1) Resubmittal is required prior to picking up permits. The next submittal should address all the above items. Submit revised Grading Plans for each grading permit, Geotechnical reports and any addenda, one copy each of the Drainage Reports, other supporting documentation, and a response letter. If you have questions or would like to set up a meeting, call me at 837-4934. Elizabeth Leibold, PE Civil Engineer Engineering Division Planning & Development Services Department |
03/04/2010 | ANDREW CONNOR | ZONING | REVIEW | Denied | Ensure that all Engineering comments and concerns are addressed prior to Zoning / NPPO final approval. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/12/2010 | CPIERCE1 | OUT TO CUSTOMER | Completed |