Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T10BU00083
Parcel: 132130730

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T10BU00083
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/24/2010 ELIZABETH LEIBOLD ENGINEERING REVIEW Approved ENGINEERS: CardnoWRG
ACTIVITIES: T10BU00083
PROJECT: Tucson Marketplace Finished Grading for COSTCO at Bridges
CASE: D09-0010
LOCATION: Ward 5
REVIEWER: Elizabeth Leibold, PE

SUMMARY: The revised grading plan submittal was received, reviewed, and stamped by Planning & Development Services Department Engineering Division at a meeting held 12MAR10. Planning & Development Services Department Engineering recommends approval of the grading permit application. The following conditions apply to the grading permit and shall be complied with / completed during grading construction.

GRADING PERMIT CONDITIONS:
The following 24 conditions apply to grading permit T10BU00083:
1) Must pull T10BU00084 Phase 1 TMP grading permit prior to, or concurrently with, permit T10BU00083.
2) Call for Pre-construction meeting when commencing finish grading construction work for COSTCO. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
3) Some grading activities will require separate special inspections by EOR or consultants. During these inspections it is recommended that PDSD Engineering Inspectors are present. Discuss during Pre-con or contact PDSD Engineering Inspector to confirm which inspections may be needed.
4) This Grading Plan and SWPPP are for onsite finish grading construction, utility infrastructure, private paving, drainage improvements, and landscaping associated with project (D09-0010) for COSTCO property in southeastern portion of Tucson Marketplace at the Bridges as shown on the approved Grading Plan T10BU00083, associated geotechnical and drainage addenda, including approved Grading Plan COSTCO Wholesale - Tucson III Warehouse sealed dated 3-11-10, SWPPP sealed 1-12-10, and Drainage Statement sealed 12-22-09 by Michael D. Pniewski, P.E.
5) Project shall conform to recommendations and requirements found in Kleinfelder West, Inc. Final Geotechnical Study Report sealed by Bruce Berends, P.E. dated 3/31/09 and any subsequent addenda by Kleinfelder West, Inc. Project No. 95267(1).
6) Contractor is responsible to protect in place the AT&T Transcontinental fiber optic line as shown on approved plans. Southeast boundary area contains an underground fiber optic cable; all work within this easement must be coordinated with the proper utilities prior to any site construction.
7) See also permit T10BU00084 for rough grading design for COSTCO.
8) A copy of stamped approved grading plan(s), grading permit(s), and reports shall be kept at site at all times, until final grading approval.
9) Grading / Disturbance Limits shall be maintained and no disturbance outside of grading limits will be allowed. Stop Work Order may be issued if disturbance occurs outside of approved grading limits as shown on approved grading plans. There shall be no disturbance, construction vehicle traffic or parking, or stockpiling outside of approved Grading Limits as shown on Grading Plan. There shall be no disturbance of Mission View Wash Regional Detention system or Greyhound Wash, unless for limited stormwater purposes and as discussed with PDSD Inspector, and as shown on approved plans. Any disturbance of county basin area or Mission View or Greyhound Wash without authorization may result in Stop Work Order and/or other penalties.
10) Interim erosion and sediment controls shall be maintained per approved grading plans at downstream areas of disturbance limits. Prior to Final Approval all temporary controls shall be removed and permanent controls shall be placed.
11) Stabilized entrances shall be maintained at all active access entrances. Use of water trucks or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.
12) Storage or placement of construction material, vehicle staging / stockpile area, and/or designated concrete washout locations shall not be located within or near regional basin, washes, floodplain, or water harvesting areas.
13) There shall be heavy duty construction fencing placed along southeast portion of project limits inside grading limits to minimize potential disturbance to Kinder Morgan Gas Line.
14) To keep construction debris from entering wash, heavy duty construction fencing at approved disturbance limits along regional basin/ floodplain/wash area may need to be provided as needed and as determined with consultation between contractor, engineer, and inspector.
15) During construction activities, traffic control plans may be required if there is a safety hazard potential from construction activities conflicting with public traffic. It may be necessary to submit a copy of a traffic control plan to PDSD. Onsite traffic control plans shall minimize traffic hazard conditions between public access to buildings, and construction vehicles & activities.
16) Any revisions to Grading Plan must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised grading plan. Call PDSD Engineering at 791-5550 to discuss any revisions.
17) If grading construction is expected to last longer than expiration date of grading permit, contact PDSD to renew/extend Grading Permit. If Final Grading Inspection has not been completed before Grading Permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for grading permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to grading permit expiration date, for consideration of grading plan extension approval.
18) City of Tucson grading standards to DS Sec.11-01 apply.
19) For inspection purposes, post City of Tucson's "AZPDES - Posting Requirements" green sheet, or the NOI at construction entrance of site, at beginning of construction activities, and maintain this posted document throughout project construction.
20) All Operators shall be identified and have separate certification statements. Assure these certifications are available on-site.
21) Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. Operator shall orally notify office listed below within 24 hours:
(a) Arizona Department of Environmental Quality
1110 W. Washington, 5th floor (5515B-1)
Phoenix, AZ 85007
Office: 602-771-4466; Fax 602-771-4505
22) Receiving waters are Mission View Wash Regional Detention Basin. Also, the following water systems are connected: Greyhound Wash, Tucson Diversion Channel, and downstream: Santa Cruz River.
23) Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed.
24) As-builts are required to be submitted under activity number T10BU00083 to PDSD permit clerks. They will be reviewed and then if acceptable, a copy will be provided to PDSD Engineering Inspector for final grading inspections. For Grading Permit Project Closure documentation, submit: one copy of original grading plans, 2 copies of as-builts, letters of completion (one for subsurface drainage system and other drainage improvements, and another letter for substantial completion of COSTCO project). Be aware that geotechnical field reports will need to be provided during grading activities as needed, and at final project closure. Field reports and letters are required for subsurface improvements and other field observations as recommended per geotechnical report, and for final completion. As-builts shall include: finished floor elevation for COSTCO, and general finished grades as determined by RLS to show substantial completion for COSTCO.

Submit any remaining fees and DEQ permit number when picking up permits. If you have questions or would like to set up a meeting, call me at 837-4934.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Planning & Development Services Department
03/24/2010 ANDREW CONNOR NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/21/2010 SUE REEVES APPROVAL SHELF Completed
05/21/2010 CPIERCE1 OUT TO CUSTOMER Completed