Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T09PI00025
Parcel: Unknown

Address:
5418 S PARK AV

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T09PI00025
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/05/2010 JOSE ORTIZ DOT TRAFFIC REVIEW Denied There are no written comments. Please address the redlines in the plan set and during the next submittal please re-submit the roll of redlines for back checking purposes.

Thanks,

Jose

Jose Ortiz, P.E.
Engineering Project Manager
Department of Transportation
(520) 837-6730
Fax (520) 791-5526
email: jose.ortiz@tucsonaz.gov
02/26/2010 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
02/26/2010 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed
11/24/2009 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
12/08/2009 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. Please submit a copy of your approved NPPO inventory / aerial. I am looking to see if there are any native plants within the ROW that should be addressed.
2. If you have a site landscape / irrigation plan, please submit it. I am looking to see if you have any irrigation lines under the new roadway. If so, you will need to get an easement for them. Call me if you have questions 837-6618
12/11/2009 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Denied
12/11/2009 RICHARD LEIGH DOT ENGINEERING REVIEW Denied December 9, 2009

SUBJECT: Blue Sky Subdivision, Public Improvements, PIA T09PI0025

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2009-038" in the title block of each sheet.

2. Include Development Services Department PIA activity number "T09PI00025"on cover sheet.

3. Include Maps and Plats, Book and Page of the subdivision on cover sheet.

4. Indicate Floodplain Use Permit on cover sheet.

5. Use COT standard north arrow in drawing.

6. Title block information should be identical except for sheet number. Extraneous labeling such as details of sheet or the street name may be labeled above title block.

7. Provide sheet to sheet match lines.

8. Centerline stationing shall run either from South to North or from West to East and read from left to right on the plan sheet.

9. Delineate and label all easements and dedications.

10. Lateral sidewalk transitions shall not be sharper than three longitudinal to one lateral per D.S. 3-01.3.3.

11. Provide vertical curves when the algebraic difference between the incoming and outgoing roadway grade is greater than 1 %. The minimum permitted length of a vertical curve is 100 feet.

12. Include complete details for all improvements within the Old Nebraska Wash. Improvements must be designed to withstand flows within the Old Nebraska Wash during a 100yr event. Provide all hydraulic calculations for sizing structures.

13. Public storm drains shall be reinforced concrete pipe or an approved equivalent. HDPE pipe is not an approved equivalent.

14. Setbacks from cut and fill slopes must comply with Development Standard 11-01.9.0. Note required setbacks from property boundary in cross sections and plan views. Additionally, barricade railing must be provided along any slope steeper than 4:1 and higher than two (2) feet.

15. Provide 100yr hydraulic capacity analysis for the roadways. The 100yr event must be contained within the public right-of-way.

16. Provide a hydraulic analysis for sizing the proposed catch basins (10yr & 100yr).

17. The culvert analysis for the proposed catch basin pipes along the curb knuckle conflict with the proposed design. The analysis provided is for a 30" pipe while the plans propose an 18" pipe, please clarify.

18. Flows from a 10yr event must be conveyed underneath the sidewalk per D.S. 3-01-4.4.F. It appears that the proposed catch basins will not be able to efficiently capture 100% of the 10yr event at the developed concentration point CP-2. Provide a design that will comply to the City of Tucson Development Standards.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
12/11/2009 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
12/11/2009 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied