Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T09PI00010
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T09PI00010
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2009 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/16/2009 GARY WITTWER DOT LANDSCAPE REVIEW Denied Submit a copy of your approved NPPO plan.
Submit a copu of your site irrigation plans.
05/04/2009 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 3 - Detail 12 - Please make sure that the grate called out in this detail is removable for maintenance.
2. Sheet 4 - Detail 5 - This detail call for CMP and we would like RCP.
3. It appears that there is no landscaping as part of this project. If there is, please submit the landscape plan to Paul Rosenboom, at 4004 S. Park Ave, Bld #2 for review.
4. All work in the right of way needs to be coordinated with Paul Rosenboom at 791-5279 ext 234.

HP & PR
05/04/2009 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied no objection pertaining to Street Maintenance.
05/06/2009 JOSE ORTIZ DOT TRAFFIC REVIEW Denied May 6, 2009
ACTIVITY NUMBER: T09PI00010
PROJECT NAME: Mountain Vail Estates
PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

3. Install R1-1 (Stop Sign) with street names on Chevrolet Drive off of Atterbury Wash Way per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2.

4. Provide a detail of the No Parking sign to be used. There is one attached to the red line plan set.

5. Illustrate the locations of all "NO PARKING" signs.

6. Place the PIA Case number on the cover sheet.

7. Add the following Signing General Notes 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans.

8. Add the following Pavement Marking/Striping General Notes to the Plans:

'ALL STREET SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE.. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING.

'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.'

'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.'


If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
05/07/2009 RICHARD LEIGH DOT ENGINEERING REVIEW Denied 6 May 2009

SUBJECT: Mountain Vail Estates, Part "C", Public Improvements, PIA T09PI0010

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2009-012" in title block of each sheet.

2. Include Development Services Department PIA activity number "T09PI00010"on cover sheet.

3. Sheet 3, Detail 1/3: Indicate proposed roadway cross slope.

4. Sheet 3, Detail 5/3: Delineate right-of-way, provide invert elevation at upstream end of proposed storm drain and indicate that the portion of storm drain within the right-of-way is R.C.P.

5. Sheet 4, Detail 1/4: Indicate a minimum 5'x 5' landing for the proposed ramps

6. Provide post barricades and appropriate signage where the pavement terminates for subdivision phasing to restrict vehicular traffic.

7. Placement of private irrigation facilities within the right-of-way will require a private utility easement. Please contact the COT Real Estate Division for information on acquiring an easement. Additionally, private irrigation facilities must meet COT adopted standards. Note the following requirements to any proposed irrigation in the right-of way.

q Schedule 80 sleeving.
q Marking tape.
q Minimum 18" depth.
q Mark/stamp on curb - IS (Irrigation System) and/or placard at back of curb
q Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs).
q Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT.

8. Verify that a 2' minimum set back is provided from the hinge point of any cut and fill slope on private property and the property line (City of Tucson Development Standard 11-09.0).

9. Add the following notes to the General Storm Drain Notes:

q Drainage pipe shall conform to PC/COT SSPI Section 501or as directed by the engineer.
q Pipe bedding shall conform to PC/COT Standard Detail 108.

10. Provide barricade railing along the right-of-way of any slope steeper than 4:1 and deeper than two (2) feet. Note ending and beginning of any proposed barricade railing.

11. Verify that the cross slopes for pedestrian cross walk areas does not exceed 2%.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
05/15/2009 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED Completed
05/15/2009 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed