Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T09PI00009
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/06/2009 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | PLEASE SUBMIT UTILITY CLEARANCE LETTERS. |
04/16/2009 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Please submit a copy of your approve NPPO plans. Submit entire site irrigation plans for common areas. |
05/04/2009 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed this plan and have the following comments: 1. Sheet 3 - Detail 5/3 & 6/3 - These details call out for CMP to be utilized. We would like for these to call out RCP instead. 2. All work in the right of way needs to be coordinated with Paul Rosenboom at 791-5279 ext 234. HP & PR |
05/07/2009 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | 5 May 2009 TO: DSD PIA Coordinator SUBJECT: Mountain Vail Estates, Part "D", Public Improvements, PIA T09PI0009 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Include the plan number "I-2009-012" in title block of each sheet. 2. Include Development Services Department PIA activity number "T09PI00009"on cover sheet. 3. Sheet 3, Detail 1/3: Indicate proposed roadway cross slope. 4. Sheet 3, Detail 5/3: Delineate right-of-way, provide invert elevation at upstream end of proposed storm drain and indicate that the portion of storm drain within the right-of-way is R.C.P. 5. Sheet 4, Detail 1/4: Indicate a minimum 5'x 5' landing for the proposed ramps 6. Provide post barricades and appropriate signage where the pavement terminates for subdivision phasing to restrict vehicular traffic. 7. Provide line and curve data for roadway centerline. 8. Provide curve data for curb knuckles, curves and cul-de-sacs. 9. Placement of private irrigation facilities within the right-of-way will require a private utility easement. Please contact the COT Real Estate Division for information on acquiring an easement. Additionally, private irrigation facilities must meet COT adopted standards. Note the following requirements to any proposed irrigation in the right-of way. Schedule 80 sleeving. Marking tape. Minimum 18" depth. q Mark/stamp on curb - IS (Irrigation System) and/or placard at back of curb q Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs). q Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT. 10. Verify that a 2' minimum set back is provided from the hinge point of any cut and fill slope on private property and the property line (City of Tucson Development Standard 11-09.0). 11. Add the following notes to the General Storm Drain Notes: q Drainage pipe shall conform to PC/COT SSPI Section 501or as directed by the engineer. q Pipe bedding shall conform to PC/COT Standard Detail 108. 12. Provide barricade railing along the right-of-way of any slope steeper than 4:1 and deeper than two (2) feet. Note ending and beginning of any proposed barricade railing. 13. Verify that the cross slopes for pedestrian cross walk areas does not exceed 2%. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
05/08/2009 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | May 8, 2009 ACTIVITY NUMBER: T09PI00009 PROJECT NAME: Mountain Vail Estates PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 3. Install R1-1 (Stop Sign) with street names at the proposed roadway entering this development off Atterbury Wash Way at Crowley Brothers Drive per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2. 4. Provide a detail of the No Parking sign to be used. Refer to previous reviews for detail drawings. 5. Place the PIA Case number on the cover sheet. 6. Add the following Signing General Notes 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans. 7. Add the following Pavement Marking/Striping General Notes to the Plans: 'ALL STREET SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE.. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. 'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.' 'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.' If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
05/15/2009 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
05/15/2009 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |