Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T09PI00007
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/19/2010 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approved | |
03/22/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | March 22, 2010 ACTIVITY NUMBER: T09PI00007 PROJECT NAME: Mountain Vail Estates PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering recommends a conditional approval of the PIA Plan; therefore revisions to the PIA Plans are required prior to submitting mylars. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. 2. Sheet 4: Details 2 and 4 - Provide 3" reflective tape on hand rail as illustrated in the redlines. 3. Sheet 5: Verify the need for NO PARKING signs on Chevrolet Drive. The roadway is wide enough that TDOT-Traffic would typically not restrict parking. 4. Sheet 6: Stop sign not needed for Quiet Dove Drive at Chevrolet Drive. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
03/23/2010 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. I need to see an MOU from the developer that states they will maintain all Landscape and Irrigation within the ROW. This should also be on the Landscape Plans. 2. Because this will be an private irragation plan that crosses public roads - you will need legal easements for all crossings. |
03/26/2010 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
03/29/2010 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
03/29/2010 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied |