Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T09PI00007
Parcel: Unknown

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T09PI00007
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/19/2010 RICHARD LEIGH DOT ENGINEERING REVIEW Approved
03/22/2010 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond March 22, 2010
ACTIVITY NUMBER: T09PI00007
PROJECT NAME: Mountain Vail Estates
PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering recommends a conditional approval of the PIA Plan; therefore revisions to the PIA Plans are required prior to submitting mylars. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed.

1. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

2. Sheet 4: Details 2 and 4 - Provide 3" reflective tape on hand rail as illustrated in the redlines.

3. Sheet 5: Verify the need for NO PARKING signs on Chevrolet Drive. The roadway is wide enough that TDOT-Traffic would typically not restrict parking.

4. Sheet 6: Stop sign not needed for Quiet Dove Drive at Chevrolet Drive.



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
03/23/2010 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. I need to see an MOU from the developer that states they will maintain all Landscape and Irrigation within the ROW. This should also be on the Landscape Plans.
2. Because this will be an private irragation plan that crosses public roads - you will need legal easements for all crossings.
03/26/2010 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
03/29/2010 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Denied
03/29/2010 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
03/29/2010 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
03/29/2010 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed
03/29/2010 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied