Plan Number: T09PI00005
Parcel: Unknown

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T09PI00005
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/22/2010 JOSE ORTIZ DOT TRAFFIC REVIEW Denied May 6, 2009
ACTIVITY NUMBER: T09PI00005
PROJECT NAME: Mountain Vail Estates
PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. Numerous unresolved comments from first submittal. See redlines on the submitted drawings (2nd submittal) and address the redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

* Note: 3rd submittal will not be accepted for review without TDOT-Traffic Engineering redlines illustrated on the 2nd submittal of the noted plans.




If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
03/23/2010 GARY WITTWER DOT LANDSCAPE REVIEW Denied Need to see MOU for maintenance by Developer or HOA.
Irrigation crossings nee Legal Easements
03/25/2010 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond Indicate the class of the proposed RCP on the applicable cross sections on sheet 4.

Indicate the Mix number for the proposed asphalt in detail 13/4.
03/29/2010 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Denied
03/29/2010 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved no objection pertaining to Street Maintenance.
03/29/2010 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
03/29/2010 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied
03/29/2010 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed
03/29/2010 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied
03/29/2010 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied