Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T09PI00005
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/22/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | May 6, 2009 ACTIVITY NUMBER: T09PI00005 PROJECT NAME: Mountain Vail Estates PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. 1. Include a response letter with the next submittal that states how all comments have been addressed. 2. Numerous unresolved comments from first submittal. See redlines on the submitted drawings (2nd submittal) and address the redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. * Note: 3rd submittal will not be accepted for review without TDOT-Traffic Engineering redlines illustrated on the 2nd submittal of the noted plans. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
03/23/2010 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | Need to see MOU for maintenance by Developer or HOA. Irrigation crossings nee Legal Easements |
03/25/2010 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | Indicate the class of the proposed RCP on the applicable cross sections on sheet 4. Indicate the Mix number for the proposed asphalt in detail 13/4. |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | |
03/29/2010 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | no objection pertaining to Street Maintenance. |
03/29/2010 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | |
03/29/2010 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | |
03/29/2010 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied |