Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T09PI00004
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/24/2010 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | March 24, 2010 TO: DSD PIA Coordinator SUBJECT: Mountain Vail Estates, Atterbury Wash Way, Public Improvements, PIA T09PI0004 PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. Please submit a response letter indicating how each of the following items have been addressed. 1. Indicate the final surface treatment proposed for the raised median island north of the intersection of Mary Ann Cleveland Way. 2. According to the current FEMA FIRM Panel 04019C2875 K and 04019C2880 K (revised January 26, 2006), the Atterbury Wash is designated as Zone A. Will a CLOMAR /LOMR be required for this project? If required, submit approved CLOMR/LOMR. 3. Was the FEMA effective model used in the analysis of the floodplain. Refer to redline plans for additional comments and comment details. If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
04/12/2010 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
04/19/2010 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | See notes from all other submittals |
04/20/2010 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | April 20, 2010 ACTIVITY NUMBER: T09PI00004 PROJECT NAME: Atterbury Wash Plans PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan. Include a response letter with the next submittal that states how all comments have been addressed. 1. See redlines on Sheet 5 of the submitted drawings and address the redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes. If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov |
04/21/2010 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | Please contact H.P. Shiao at 791-5279 Ext.203 DOT Streets & Traffic Maintenance comments. |
04/21/2010 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
04/21/2010 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | Please contact H.P. Shiao at 791-5279 Ext.203 DOT Streets & Traffic Maintenance comments. |