Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T09PI00004
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T09PI00004
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2009 TAMI HAUSER UTILITY CLEARANCES COT STREETS DIVISION Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES PC WASTEWATER MGMT Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES QUEST COMMUNICATION Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES COX COMMUNICATION Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES SOUTHWEST GAS CORP Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES EL PASO NATURAL GAS Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/06/2009 TAMI HAUSER UTILITY CLEARANCES KINDER MORGAN ENERGY Denied PLEASE SUBMIT UTILITY CLEARANCE LETTERS.
04/16/2009 GARY WITTWER DOT LANDSCAPE REVIEW Denied Submit a copy of your approve NPPO plan.
Submit site irrigation plans.
(in an effort to save one entire tree, please do not submit the plan set to me on any future sumbittal of this project)
05/04/2009 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved We have reviewed this plan and have the following comments:

1. Sheet 4 - Detail 3/4 - Please provide access for maintenance of the wash and culvert area. Please show the toe down with scour depth. Also, please place sign, "Do Not Enter When Flooded".
2. All work in the right of way needs to be coordinated with Paul Rosenboom at 791-5279 ext 234.

HP & PR
2
05/04/2009 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved No objection pertaining to Street Maintenance.
05/06/2009 JOSE ORTIZ DOT TRAFFIC REVIEW Denied May 6, 2009
ACTIVITY NUMBER: T09PI00004
PROJECT NAME: Atterbury Wash Plans
PROJECT ADDRESS: 11311 E Mary Ann Cleveland Wy
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal. The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

3. Install a W14-2a (No Outlet) plaque beneath the street name signs along Atterbury Wash Way at Mary Ann Cleveland Way.

4. Atterbury Wash Way is a local road therefore the speed limit will need to be posted at 25MPH.

5. Revise the "No Parking" sign detail as illustrated in the redlines.

6. Place the PIA Case number T09PI00004 on the cover sheet.

7. Add the following Pavement Marking/Striping General Notes to the Plans:

'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.'

'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.'

'ALL WARNING SIGN PANELS SHALL BE FLUORESCENT YELLOW DIAMOND-GRADE (DG-CUBED OR EQUIVALENT) SHEETING. ALL SCHOOL ZONE SIGNS SHALL BE FLUORESCENT YELLOW-GREEN DIAMOND GRADE (DG-CUBED OR EQUIVALENT) SHEETING. ALL OTHER SIGN PANELS SHALL HAVE HIGH INTENSITY PRISMATIC TYPE IV SHEETING.'


If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
05/07/2009 RICHARD LEIGH DOT ENGINEERING REVIEW Denied SUBJECT: Mountain Vail Estates, Atterbury Wash Way, Public Improvements, PIA T09PI0004

PROJECT REVIEWER: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number “I-2009-008” in title block of each sheet.

2. Include Development Services Department PIA activity number “T09PI00004”on cover sheet.

3. Sheet 1: Provide a signature line for Pima Co. Regional Water Reclaimed Department.

4. Add the following notes to the General Notes:

? All Drainage Infrastructures, indicated on the plans, are in accordance to the approved Drainage Report approved by Development Services Department.
? Flooplain Use Permit No. ________________ has been issued by City of Tucson Development Services Department for work impacting City and FEMA floodplains.

5. Sheet 3, Detail 1/3 and 2/3: Indicate proposed roadway cross slope.

6. Sheet 5: Provide complete details for the raised median island north of the intersection of Mary Ann Cleveland Way. (see redlines)

7. Provide a turnaround, per COT Development Standard 3-01.62.C, at the north end of Atterbury Wash Way.

8. Provide a slope easement for the proposed road embankment for Atterbury Wash Way.

9. Will a CLOMAR /LOMR be required for this project? If required, submit approved CLOMR/LOMR.

10. Was the FEMA effective model used in the analysis of the floodplain?

11. Has a floodplain use permit (FUP) been issued by DSD for the proposed development within the floodplain? Include FUP number in general notes.

12. Is a 404 Permit required for this project?

13. Include details for proposed retaining wall in this drawing set. Retaining wall drawings must be sealed by an Arizona Registered Professional Structural Engineer.

14. Provide beginning and ending stationing for the proposed grouted Rip-Rap bank protection toe-down structure for the inlet and outlet of the proposed box culvert.

15. Provide a detail demonstrating the proper installation of the proposed grouted rip-rap.

16. Placement of private irrigation facilities within the right-of-way will require a private utility easement. Please contact the COT Real Estate Division for information on acquiring an easement. Additionally, private irrigation facilities must meet COT adopted standards. Note the following requirements to any proposed irrigation in the right-of way.

? Schedule 80 sleeving.
? Marking tape.
? Minimum 18" depth.
? Mark/stamp on curb - IS (Irrigation System) and/or placard at back of curb
? Sleeves must be in a recorded easement (easement width is dependent on what is needed for installation and/or repairs).
? Sleeve should extend beyond the right-of-way (into private property), unless otherwise approved by TDOT.

17. Verify that a 2’ minimum set back is provided from the hinge point of any cut and fill slope on private property and the property line (City of Tucson Development Standard 11-09.0).

18. Provide barricade railing along the right-of-way of any slope steeper than 4:1 and deeper/higher than two (2) feet. Note ending and beginning of any proposed barricade railing.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsonaz.gov
05/15/2009 TAMI HAUSER PIA COORDINATOR CUSTOMER CALLED Completed
05/15/2009 TAMI HAUSER PIA COORDINATOR OUT TO CUSTOMER Completed