Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09OT02668
Parcel: 11901006A

Address:
690 E 36TH ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T09OT02668
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/29/2009 LOREN MAKUS ENGINEERING REVIEW Approved This will be reviewed along with the associated site plan. The site plan must be reviewed by the zoning reviewer before being reviewed by the engineering reviewer.
12/29/2009 LOREN MAKUS ENGINEERING REVIEW Approved January 20, 2010
The applicant is authorized to use a portion of the flood hazard area (City of Tucson City Engineer's Flood Hazard Area) in the City of Tucson, Arizona, on the property described as 690 East 36th Street for the purpose of making site improvements at an existing industrial site.

The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit.

The following conditions shall apply to this permit.

1. All work shall conform to the approved improvement plans which are made part of this permit (T09CM03139) which is for site improvements.

2. No construction or alteration of a structure is authorized by this permit.

3. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.

4. Any additional improvements not reflected in the current permit will be subject to separate review and additional permits.

5. This permit becomes invalid and is subject to additional floodplain review, if any required improvement permit(s') changes the configuration of the structure and or site development.

This Floodplain Use Permit will be automatically revoked and becomes invalid for non-compliance to conditions set forth in this permit.
The applicant is authorized by the City Engineer to receive a floodplain use permit subject to the above referenced conditions and restrictions.

Final Status

Task End Date Reviewer's Name Type of Review Description
03/12/2010 SUE REEVES APPROVAL SHELF Completed
03/12/2010 CPIERCE1 OUT TO CUSTOMER Completed