Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03415
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/11/2010 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. If the building energy compliance is not in accordance with ASHRAE 90.1, the duct insulation shall be determined by Section 503.2.7, IECC 2006, as amended by the City of Tucson. Reference: Section 501.2, IECC 2006, as amended by the City of Tucson. 2. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference: Section 302.1, IMC 2006. 3. Revise plans as required to provide a separation of at least ten feet between air intake opening for EC-1 and the exhaust opening for EF-1. Reference: 401.4.1, IMC 2006. 4. Provide structural calculations and details to show that the Type I hoods are supported from the building structure in accordance with Section 507.6, IMC 2006. Reference: Section 302.1, IMC 2006. 5. Coordinate the stainless steel covering of the wall adjacent to the grease hood to extend 18" from the hood (see detail 4/A4.1). Reference: Section 507.9, IMC 2006. |
01/13/2010 | RICK MYERS | PLUMBING-COMMERCIAL | REVIEW | Approved | |
01/20/2010 | GERRY KOZIOL | WWM | REVIEW | Approved | |
01/28/2010 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
01/28/2010 | RICHARD JIROUDEK | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/29/2010 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
01/29/2010 | SUE REEVES | REJECT SHELF | Completed |