Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T09CM03389
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/24/2009 | TERRY STEVENS | ZONING | REVIEW | Approved | |
12/24/2009 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
12/24/2009 | ERIC NEWCOMB | ADA | REVIEW | Passed | |
12/24/2009 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Needs Review | 1. SHEET M-3; DETAIL 111: NOTE AT 1/2" ALL THREAD RODS REFERS TO STRUCTURAL DRAWINGS. NO STRUCTURAL DRAWINGS ARE INCLUDED IN THIS REVIEW. PROVIDE DETAIL. 2. GENERAL: ARE THE NEW UNITS ON THE ROOF HEAVIER THAN EXISTING UNITS? IF SO, PROVIDE STRUCTURAL CALCULATIONS TO INDICATE THAT THE EXISTING ROOF CAN SUPPORT THE NEW LOADS. |
12/24/2009 | ERIC NEWCOMB | ZONING HC | REVIEW | Needs Review | |
12/24/2009 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/24/2009 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/30/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show how the fan coil is connected to the building structure. 2. Provide a design for interlocking the exhaust fans to the heat pump. |
12/30/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: 5151 E Broadway Bl T09CM03389 Office TI 5842 Sq Ft The electrical plans have been denied for the following: 1. Sheet E-4 shows the feed for AC-1in Pnl L(1,3), also Sheet E-2 shows AC-1 in the IT room, however Sheet M-3 lists a split system(FC-1,CU-1) for the IT room. The CU-1 unit is listed at 208v 1 phase at 14.8 FLA, the FC-1 unit is listed at 460v 3 phase 22.9 FLA, clearify or correct. 2. Sheet E- Pnl H shows a new 60/3 cb feeding the new 45kva transformer, then feeding Pnl WPA. Sheet E-4 shows a 125 amp 3p cb feeding Pnl L1 via the new 45kva transformer. Also the conductors in Pnl H show #1 conductors , they should be a 60 amp with # 6 conductors. 3. Circuit L 24 is in the panel schedule not on the power plan, feeding receptacles. Ray T Majuta PDSD, Cof Tucson Elect Pln Ck 12/30/09 Ray.Majuta@tucsonaz.gov |
12/30/2009 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/30/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Clarify the sizes for the water pipe branches serving the flush valves and the connection sizes (e.g. 3/4" for the water closets and 1" for the urinal) |
12/30/2009 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/14/2010 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
01/14/2010 | SUE REEVES | REJECT SHELF | Completed |