Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T09CM03286
Parcel: 123121550

Address:
2365 N VINE AV

Review Status: Completed

Review Details: RESIDENTIAL BLDG/ZONING/ENGINE/WWM

Permit Number - T09CM03286
Review Name: RESIDENTIAL BLDG/ZONING/ENGINE/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/14/2010 RONALD BROWN BUILDING-RESIDENTIAL REVIEW Denied GENERAL
1. Code reference: 2006 IRC / 2006 UPC. In your plumbing specifications, you have indicated a preference for the IBC Plumbing code. Plumbing shall comply with 2006 UPC with state amendments (AZ State plumbing code). The plans
should reference this code, or appeal to the Building Official for alternate design approval.
2. Minumum letter sizes are 3.32". Your Energy Code Calculations form is much smaller than required. Please revise and resubmit.
3. Specify each scale used. No scales are indicated on any of the floor plan (A, S, M, P, nor E) and the exterior elevations.
SITE PLAN
4. Specify underground electrical service as per amendment section 111.1.1.
5. Provide gas piping for structure or submit exemption documentation, Arizona Statute 30-809.
6. Dimensions of all structures on site, distances from property lines to structures, square footage calculations, and locate any unique topographical areas.
FLOOR PLAN
7. Show the location of attic access min. 22" x 30", R807.
8. Doors and Windows: Show location and size of all doors and windows and provide all window types, and designate the operable portion of windows on the floor plan.
a. Max sill height = 44"
9. Please show location of tempered glass, R308.4.
a. Within: 18" of the floor, 24" of doorways, less than 60" above tub/shower floors
b. Adjacent to stairways and landings (36" of a walking surface, less than 60" above)
FOUNDATION PLAN
10. Note grade away from foundations shall fall min 6" within the first 10’, R401.3.
STRUCTURAL FRAMING PLAN
11. Specify design criteria on plans. Provide values for floor/roof dead and live loads.
12. Show braced wall panel layout and materials and nailing schedule on Framing plan.
ELEVATIONS
13. Show HVAC unit and railing (as required) on elevations.
14. Specify height above grade for finished floor, windows/doors, exterior walls, rooflines, porches, etc.
SECTIONS AND DETAILS
15. Detail all over-framing connections for intersecting pitched roof assemblies. Provide a minimum opening of 22" by 30" for access and ventilation between over-framed assemblies (>30 S.F.), R807.
16. Specify wall and ceiling covering. Note: Ceiling gypsum board must be either 5/8" or ½" sag resistant
when applied to ceilings framed at 24" o/c, IRC table R702.3.5 footnote d.
ELECTRICAL PLANS
17. Kitchens and dining rooms require two or more 2O-amp small appliance circuits. Such circuits shall be GFCI protected and shall not serve other rooms (except breakfast areas, pantries, etc.), E3801.3.
18. Bathrooms require a separate 20-amp circuit with receptacles within 3’ of the basin, E3801.6.
19. Please note that bedroom outlets shall be arc-fault protected (receptacles, lights, and smoke detectors), E3802.12.
PLUMBING PLANS
20. Plumbing shall comply with 2006 UPC with state amendments (AZ State plumbing code). The plans should reference this code, or appeal to the Building Official for alternate design approval.
21. Water heater specs calls for a gas fired water heater while the electrical drawings show an electrica water heater. Please clarify.
22. Fixture unit schedule required for the entire property (including existing) UPC Tables 6-5 and 7-3.
23. Condensate disposal may not discharge into a plumbing vent, UPC 908.1.
MECHANICAL PLANS
24. Show supply and return ducts with minimum R-8 insulation, R1103.2.1.
25. Please designate the location, capacity and fuel type of the heating and air conditioning equipment. Designate
the locations of each supply register, return air grill and all ductwork.
26. Provide an equipment specification list, M1302.1.
27. Show location of railing for heating or air conditioning equipment located on the roof.
28. Show the condensate line and secondary for HVAC unit, M1411.3.
OUTDOOR LIGHTING CODE
29. Show compliance with City of Tucson Outdoor Lighting Code with an approved lighting calculation in
accordance with OLC 3.1.2. Include all exterior fixtures on the property in the calculations.
30. Provide cut sheets for all FCO fixtures showing the angle of cutoff, light emissions and fixture
wattage. All other fixtures are assumed to be unshielded (non-FCO style).
ENERGY CONSERVATION CODE
31. Please provide a note requiring the insulation certificate shall be posted in the electrical distribution panel
before final inspection, N1101.8.
CODE ADOPTION
32. The City of Tucson adopted the 2006 IRC with amendments on 6/12/2007; the 2006 UPC with amendments on 7/10/2007; effective 1/1/2007 the Inclusive Home Design; starting 3/1/2009 Solar Water Preparation and 7/1/2009 Solar Photo-Voltaic Preparation. All new SFR and duplex plans should reference these codes. Amendments to adopted codes are at the City web-site http://www.tucsonaz.gov: Planning, Building, & Business; under the Building topic; Building Ordinances and Codes; Building Codes.
SOLAR WATER SYSTEM
33. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: control and ¾" piping for water with rooftop termination; 3" metallic sleeve; or an accessible attic (clear path 30" wide x 30" high) over the water heater.
SOLAR PHOTO VOLTAIC SYSTEM
34. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 with the following provisions:
a. A 4 square feet area for (meter, disconnect & inverter) equipment adjacent to the electrical service panel or near the proposed collector panel space.
b. The best roof space available for accommodating PV solar collector panels with capacity for collector dead loading (typically 4 lbs/SF).
c. A minimum 3,800 volt-ampere PV electrical load entry on the Service Load Calculation (Show as a continuous load of 15.8 A). 4. An Electrical Panel Schedule with a 240 volt circuit breaker space labeled "reserved for Photo Volt

END OF REVIEW
12/21/2009 GERRY KOZIOL WWM REVIEW Approved
12/22/2009 ANDREW CONNOR NPPO REVIEW Passed